Laserfiche WebLink
City of Orono <br /> Permanent Sign Permit Application <br /> All of the information below must be submitted in addition to the completed application form: <br /> REQUIRED SUBMITTALS: <br /> 1. Drawing of the proposed sign, including all of the following: <br /> • Dimensions of sign <br /> • Message/content of proposed sign <br /> • Structural drawings (including footings) <br /> 2. Sketch (or survey)of the site, including all the following: <br /> • North direction and scale <br /> • Location of structures on the lot(and dimensions} <br /> • Street Names <br /> • Amount of road frontage <br /> • Placement of proposed sign <br /> • Existing sign inventory(location and size of existing signs) <br /> 3. Signs: <br /> • Any signs to be removed? <br /> • If so, list how many and square footage <br /> APPLICANT ACKNOWLEDGEMENT: <br /> • This is only an application for a permit. I WILL NOT erect the sign until I have received the permit. I understand a double fee <br /> will be charged for any sign erected prior to obtaining a pertnit. Incomplete applications will not be processed; <br /> • volation of City Ordinances is a misdemeanor. Each day the violation continues in existence shall be deemed a separate <br /> violation; <br /> • This information is complete and accurate;that the work will be done in conformance with the Ordinances and Codes of the City <br /> of Orono,with the State Building Code and in accordance with the approved plan. . <br /> �,�/� <br /> Applicant Signature: �� � Date: �� � p <br /> For Multi-Tenant Buildings: <br /> Property Owner or ��� � � <br /> Manager Signature: �� �-, �� Date: O � � � <br /> Printed Name of Property Owner or anager' l I� '" �/4� i <br /> Phone Number: <br /> �P 1 Z -�(9� .- ��� ( Email and/or Fax Number. �� <br /> ys2_ y� � - ��a <br /> Building Staff Approval: Date: t0 '�-�` O� <br /> Zoning Staff Approval: �' I vY �D� Date: ` � ��'I <br /> � <br /> 1(applications)�Permanent Sign Permit Application.doc <br /> 4J8/200910:22 AM <br />