Laserfiche WebLink
. . � Fees to be Char ed YES NO <br /> Permit <br /> Plan Review <br /> State Surcharge <br /> Investigation Fee <br /> . SAC—Number of SAC Units <br /> Other(specify) <br /> S uare Foota e $ er S uare Foota e <br /> Basement X = $ <br /> 1 St Floor X = $ <br /> 2nd FI00� X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ <br /> Orono Inspections Required Work Requiring Separate Permits <br /> � Footing � Site 0 Plumbing � Grading/Filling <br /> � Poured Wall � Silt Fence/Erosion Control 0 Mechanical � Fire <br /> 0 Foundation Survey 0 Hardcover Removal � Fireplace � Water Connection <br /> � Framing � Other(specify) 0 Masonry � Sewer Connection <br /> � Waterproofing/Drain tile � Mfg. 0 Lawn Irrigation <br /> � Foundation Waterproofing 0 Other(specify) � Landscaping <br /> Framing 0 Septic <br /> � Insulation <br /> � As-Built Survey <br /> Final <br /> � Lathe Required State Permits <br /> 0 Other(specify) <br /> � Well 0 Electrical <br /> REMARKS (in-house):� Sf �►V�I�-� <br /> 3Z s ho►c- .{�e�;o� <br /> I�a � Z,nnio� <br /> l� s � K� <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> � See Builder Acknowledgement Form <br /> 0 Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms�plan review checklist 06-2017.docx <br />