Laserfiche WebLink
�� <br /> ��� � <br /> s <br /> ..� �\ A. Excavale area for new lank,air test,place and backfill to top of(1)new � <br /> 4,000 gallon DW FRP underground storage tank in new tank excavation. <br /> � Tank bury depth is to be 42"below grade backfilled with approved material. g� <br /> -' B. Remove(5)existing dispensers. �; <br /> j% � C. Demo and remove(5)existing islands,breakout concrete over(4)existing g F <br /> � tanks as necessary to remove existing spill manholes,submersibles and �e <br /> ; ' tank gauge probes.Saw existing steel sump off the tank and dispose of, � <br /> /" paint steel with bitumastic paint,test CP system on tanks. Y �$ <br /> � D. Demo oul concrete from tanks to(5)islands,excavate trenches. <br /> / E. Supply and install(5)piping sumps and(5)dispenser sumps. o o . <br /> � F. Pipe(5)�ew fill pipe assemblies with ove�ll prevention drop tubes on all m ��,� <br /> / except diesel,pipe(5)tank gauge risers inside sumps,reinstall(4)existing p p s�g <br /> � submersibles and(1)new submersible in E-85 tank. �n o$g <br /> � N �O G. Pipe 2"DW FRP discharge lines from(3)tanks to front islands(87-E85-91) > <br /> G and pipe(3)2"DW FRP discharge lines from(3)tanks to one of the � W� <br /> d i sp e n s e r s o n t h e s i d e i s l a n d(8 7-E 8 5-d i e s e l)a n d(3)2"DW FRP dischar ge <br /> I W�E Z� lines to the other side island(87-E85-Non-Oxy). w'-m <br /> "��' ��EME�* \ ,L H. Pipe(1)2"FRP vent line from tank connection to canopy column.Utilize a o�� <br /> I �NL] oWCi�lEs <br /> S a, flexible connection at tank. Vent riser to have a 2"pres/vac vent cap. <br /> „oN-❑„ �'" � I. Reroute and run electncal conduit as required.Pull all new wire to <br /> , ,e� � dispensers and submersibles. <br /> J. Form and pour(5)4'x8'islands and instali(10)U-shaped barricades ? � a <br /> � �i s�" '"�""" � K. Patch trenches and area over tanks � <br /> j��3 �� �� L. Install(5)new Gilbarco B�ender dispensera � � ' - <br /> a' M. Place system in service. -_ <br /> o� c � e <br /> 4 _ <br /> Os ' � � # <br /> I pc � / , _%' <br /> �V, _. <br /> �W D f5f � � yl�`: <br /> S <br /> O� <br /> �.o� � <br /> I L \\ S' <br /> . � � <br /> ,_Ea5_9� <br /> ��• G=NEW GAUGE RISER <br /> v <br /> I S=NEW OPW EDGE SPILL MANHOLE t�lJ �,n o d� <br /> PRo�T11NE6 T=TURBINE PUMP �"'� � <br /> A=ALCOHOL RATED OVERFILL DROP T E a -°'Z ° �fA� <br /> o� � � <br /> I=INTERSTITIAL MANHOLE ' NOTE: � � C�� a <br /> lC � m � m m <br /> I I � I I � PRODUCT PIPE ARRANGEMENT UNDER EACH > ° >� � — <br /> � e�-Hea-vi e>-Ne�-s� / Z � z �o <br /> DISPENSER MUST BE FIELD VERIFIED WITH <br /> � — —__ — — --' � GILBARCO VIA KURT/CHERYL WHILE ON SITE. <br /> � <br /> C❑UNTY R❑AD 15 � <br /> D-13654-3 <br /> � <br /> • - <br /> � REVlE1AIE� for COD� COibRPLtANCE <br /> PLAN CHECKED BY w DATE �c-L5 -�1 y <br /> + T�me.s �/w..��e�i� <br />