Laserfiche WebLink
. , , � <br /> f <br /> A+ B=maximum 100 s.f. per face (including sign copy&base*) <br /> A=sign copy, where 75%of A + B is the maximum allowed sign copy <br /> B =base* (where 25%of A+B is the minimum provided base*) <br /> *The sign base (B) must be constructed of materials consisting of brick, natural stone, <br /> stucco or materials consist with the principal structure so long as the exterior wall <br /> finishes of the principal structure meet the requirements of Section 78-646(g)(1). <br /> ( <br /> -- ' - r - � <br /> � - t <br /> - � 10 M�►x <br /> - � - <br /> - � _ � <br /> r <br /> a � ' ( � <br /> , <br /> *�'`"' 1 ' — 1 � <br /> s <br />