My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-P08097 - plumbing
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3333 Shoreline Drive- 20-117-23-11-0024
>
Permits/Inspections
>
2004-P08097 - plumbing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:47:40 PM
Creation date
11/30/2018 2:19:52 PM
Metadata
Fields
Template:
x Address Old
House Number
3333
Street Name
Shoreline
Street Type
Drive
Address
3333 Shoreline Drive
Document Type
Permits/Inspections
PIN
2011723110024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � � � � <br /> MINNESOTA DEPARTMENT OF HEALTH <br /> Division of Environmental Health <br /> REPORT ON PLANS <br /> Plans and specifications on plumbing: Caribou Coffee Store No. O1-0153, 3333 Shoreline Drive, Orono, <br /> Hennepin County, Minnesota,Plan No. 050837 <br /> OWNERSHIP: <br /> SUBMITTER(S): Buchman Plumbing Company, Inc.,P.O. Box 11070,Minneapolis,Minnesota 55412 <br /> Plans Dated: <br /> Date Received: August 26, 2004 <br /> Date Reviewed: October 7, 2004 <br /> SCOPE: This review is limited to the design of this particular project only insofar as the provisions of the <br /> Minnesota Plumbing Code, as amended, apply, and does not cover the water supply or sewerage system to which <br /> this plumbing system is connected. The review is based upon the supposition that the data on which the design is <br /> based are correct, and that necessary legal authority has been obtained to construct the project. The <br /> responsibility for the design of structural features and the efficiency of equipment must be taken by the project <br /> designer. Approval is contingent upon satisfactory disposition of any requirements included in this report. <br /> Special care should be taken to insure that the material and installation of the plumbing system are in accordance <br /> with the provisions of the Minnesota Plumbing Code. A copy of the approved plans and specifications should <br /> be retained at the project location for future reference. <br /> A set of the identified plans and specifications is being returned to Buchman Plumbing Company,Inc. Enclosed <br /> is a copy of the report and transmittal letter to be forwarded to the project owner. <br /> INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of <br /> the Minnesota Plumbing Code. As specified in Minnesota Rules,part 4715.2830,no plumbing work may be <br /> covered prior to completing the required tests and inspections. Provisions must be made for applying an air test <br /> at the time of the roughing-in inspection as outlined in Minnesota Rules,part 4715.2820, subpart 2, of the code. <br /> A manometer test, as specified in Minnesota Rules,part 4715.2820, subpart 3, is required at the time of the <br /> finished plumbing inspection. It is the responsibility of the contractor/installer to notify the Minnesota <br /> Department of Health when an installation for a state contract job, licensed facility, or project in an area where <br /> there is no local administrative authority is ready for an inspection and test. To schedule inspections,contact the <br /> state plumbing standards representative for your region, or call the metro off'ice inspection hotline at 1-800-926- <br /> 6216 (7:30 a.m. to 9 a.m.), or 651/215-0836(8 a.m. to 9 a.m.) on Monday,Wednesday or Friday. <br /> REQUIREMENT(S): <br /> 1. All plumbing shall be installed in accordance with the Minnesota Plumbing Code (see Minnesota Rules, <br /> part 4715.0320). <br /> 2. The plans indicate that this submittal consists of the above ground portion of the plumbing installation only. � <br /> The below ground portion of this project was reviewed by our ofFice under Plan No. 050479, which was <br /> submitted by a different plumbing contractor. Prior to installation of the above ground portion of the <br /> plumbing system, it must be verified that the underground was installed in accordance with the previously <br /> reviewed plans and the requirements of the Report on Plans for Plan No. 050479 (see enclosure).. <br /> 3. Verify that a floor drain without a backwater valve is installed on the individual drain branch serving the <br /> three-compartment sink. <br />
The URL can be used to link to this page
Your browser does not support the video tag.