Laserfiche WebLink
OPERATION <br /> O PNEUMATIC O EIECTFIC O HYDRAUUC <br /> PIPIN(3 SUPERVISED O YES O NO LDETECTING MEDIA SU'PERVISED O YES O NO <br /> DOES VALVE OPERAiE fROM 1HE MANUAL TRIP AND/OR REMOTE CONTROL SIATIONS O YES O NO <br /> DELUGE 8 IS TNEfiE AN ACCESSIBLE FACILITY IN EACN CIRCUIT FOR 1ESTING IF NO,EXPLAIN <br /> PREACTION <br /> VAlYE3 O YES O NO <br /> DOES EAC'H CIRCUII OPERAIE DOES EAC CIRCUIT XIMU I O <br /> ``/� MAKE MODEL SUPEFiVISION LOSS ALARM OPERATE VALVE RELEASE OPERATE HELEASE <br /> 1� YES NO YES NO MIN. C. <br /> kiY�B�IAII�:Hydroslatic teste shall be made at not lesa lhan 200 psl(13.6 bars)(or 1wo hours or 50 psi(3.4 bars)above slatk presa�re in eYcese <br /> ol 150 ps (10.2 bars)lor two hours.Diflerential dry ppe valve dapperc ehall be leh ope�during test to pevenl damage.AII abovegrourd piping leakage <br /> TEST shall be slopped. <br /> DESCRIP110N �M�Eslab�ish 40 psl(2.7 bars)air pressure and moasure drop which shaA not exoeed 1•i/2 psi(0.1 bars)in 24 hours.Tesl pressure <br /> tanla al normal waler level and air pressure and measure air ressure dr which shap nol ezceeA 1•1/2 si 0.1 bars in 24 houn. <br /> ALL PIPING NYOROSTATICAIIY TESTED AT .�OID PSI FOfi Z� HRS. IF NO,STATE REASON <br /> OFiY PIPINC3 PNEUMATICALLY TESTED O YES O NO <br /> EQUIPMENT OPERAIES PROPEF�LY Cl YES O NO <br /> p0 YOU CERTIFY AS THE SPRINKLER CONiRACTOR TNAi'ADOITIVES AND CORROSIVE CNEMICAIS,SOOIUM SIUCATE OR <br /> OERIVATIVES OF SODIUM SILICAIE,BRINE,OFi OTIIER CORFIOSIVE CFIEMICALS WERE NOT USEO FOR TESTING SYSTEMS OR <br /> TESTS STOPPING LEAKSt x YES O NO <br /> DRAIN READINO OF GAGE LOCATED NEAR WATER FiESIDUAL PRESSURE WITH VALVE IN TEST �� <br /> TEST SUPPLY TEST CONNECTION: �_�'S� CONNECTION OPEN WIDE �_PS� <br /> UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISERS FLUSI�ED BEFO{iE CONNECTION MADE TO SPRINKLER PIPING. <br /> VERIFIED 8Y COPY OF iHE U FORM NO.858 O YES O fJ0 OTNER EXPLAIN <br /> FLUS�IED BY INSIALLER OF UNOEF�- F��t�1r� �"��1 <br /> (3ROUN0 SPRINKLER PIPING O YES O NO <br /> BLANK TESi1NO <br /> NUMBER USED LOCA110NS NUMBER REMOVED <br /> (iASKEt9 � <br /> WELOEO PIPIN(3 YES O NO , <br /> IFYES... <br /> WITH TFIE REOUI EMENTS Of AT IEAST�AWS D10.9,LEVEI.AR�-�ING PROCEDURES COMPLY Q yES O NO <br /> WELDING �ptiYip�jANCETWIT 1FTF E AEO�REMEN S OF ATLE�AST AWS DIOL9,lEV�UARI�IEO IN A YES O NO <br /> p0 YOU CERTIFY THAT wEIDING WAS cARRIED Oui IN CUMPt IAr�CE wITH A <br /> ROETRIEVEDE HAT OPE�I�STIN Plf'It G AREI SMWTHSTHAI SLAG ANU O F ERpE <br /> WELOING RESIDUE ARE AEMOVED,AND TIIAT T11E INTERNAL OIAMEiERS OF b.YES O NO <br /> PIPING ARE NOT PENETRATED __ _ <br /> CUTOUIS pp YOU CERTIFY iNAT YOU NAVE A CONTROL FEATURE TO ENSURE THAT ALL �p YES O NO <br /> (DISCS� CUTOUTS(OISCS)ARE HETRIEVED7 __ ___ <br /> HY�RAUUC NAME PIATE PROV�DEO IF NO,EXPLAIN <br /> DATA <br /> NAIIAEPLATE O YES O NO <br /> OATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: <br /> RENIAHKS <br /> NAME OF SPRINKLER CONTRACTOR <br /> OLSf-�t t' �¢.z ?un�t�oN — <br /> TES1S WITNESSEO BY <br /> SIGNATURES <br /> FOR PRO RTY O Fi(SIGNED) TITLE DATE <br /> - � ac.(J� �z���c,4-� � � z-3- �- <br /> FOR SP ER C TiiACTOR(SIGNED) TITLE OATE , <br /> -3-g <br /> AOUITIONAL EXPLANATtON ANO NOTES <br /> i <br />