My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
site work specs
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3333 Shoreline Drive- 20-117-23-11-0024
>
Misc
>
site work specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:47:46 PM
Creation date
11/30/2018 12:37:57 PM
Metadata
Fields
Template:
x Address Old
House Number
3333
Street Name
Shoreline
Street Type
Drive
Address
3333 Shoreline Drive
Document Type
Misc
PIN
2011723110024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� SECTION 02700 <br /> SITE UTILITIES <br /> PART 1: GENERAL <br /> 1.01 RELATED DOCUMENTS <br /> A. Conditions of the Contract and portions of Division One of this Project <br /> Manual apply to this Section as fully as though repeated herein. <br /> 1.02 RELATED SECTIONS <br /> A. Consult drawings and specifications of other trades for correlating <br /> information. <br /> 1.03 SUBMITTALS <br /> A. Submit to the Engineer: <br /> 1 . Two copies of test and inspection certificates immediately upon <br /> completion. <br /> 2. One copy of record drawings showing all changes made during <br /> construction. � � <br /> 1.04 REGULATORY REQUIREMENTS <br /> A. Comply with the rules and regulations of the Local Utility Companies. <br /> He shall check with each utility company providing service to this <br /> project and determine or verify their requirements regarding incoming <br /> domestic water, sprinkler, sanitary and storm sewer and gas. <br /> B. Secure and pay for all permits, licenses, fees and inspections . <br /> C. Make all arrangements with each utility company and pay all service <br /> charges associated with new or modifications to existing services. <br /> D. The status of any code provision that may be in question must be <br /> resolved with the Local inspection authority. <br /> E. Where drawings or specifications call for workmanship or materials in <br /> excess of code requirements, a lower grade of construction will not be <br /> permitted. <br /> 1.05 CLEANING <br /> A. When all the site work is complete, thoroughly clean all material and <br /> equipment installed as a part of this contract and leave all equipment <br /> and material in new condition. <br /> B. At job completion, this Contractor shall clean up and remove from the <br /> site all debris, excess material , and equipment left during the progress <br /> of this contract. <br /> , <br /> 02700-1 <br /> 191/1006. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.