My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: Caribou coffee/Rick's
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3333 Shoreline Drive- 20-117-23-11-0024
>
Correspondence
>
Re: Caribou coffee/Rick's
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:47:45 PM
Creation date
11/30/2018 12:29:17 PM
Metadata
Fields
Template:
x Address Old
House Number
3333
Street Name
Shoreline
Street Type
Drive
Address
3333 Shoreline Drive
Document Type
Correspondence
PIN
2011723110024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> �i;f' ' i �li�� <br /> MINNESOTA DEPARTMENT OF HEALTH <br /> Division of Environmental Health ;";, . _ <br /> REPORT ON PLANS � � ��� <br /> Plans and specifications on plumbing: Caribou Coffee Store No. 01-0153, 3333 Shoreline Drive, Orono, <br /> Hennepin County,Minnesota,Plan No. 050837 <br /> OWNERSHIP: <br /> SUBMITTER(S): Buchman Plumbing Company, Inc., P.O. Box 11070, Minneapolis,Minnesota 55412 <br /> Plans Dated: <br /> Date Received: August 26, 2004 <br /> Date Reviewed: October 7, 2004 <br /> SCOPE: This review is limited to the design of this particular project only insofar as the provisions of the <br /> Minnesota Plumbing Code, as amended,apply, and does not cover the water supply or sewerage system to which <br /> this plumbing system is connected. The review is based upon the supposition that the data on which the design is <br /> based are conect, and that necessary legal authority has been obtained to construct the project. The <br /> responsibility for the design of structural features and the efficiency of equipment must be taken by the project <br /> designer. Approval is contingent upon satisfactory disposition of any requirements included in this report. <br /> Special care should be taken to insure that the material and installation of the plumbing system are in accordance <br /> with the provisions of the Minnesota Plumbing Code. A copy of the approved plans and specifications should <br /> be retained at the project location for future reference. <br /> A set of the identified plans and specifications is being returned to Buchman Plumbing Company, Inc. Enclosed <br /> is a copy of the report and transmittal letter to be forwarded to the project owner. <br /> INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of <br /> the Minnesota Plumbing Code. As specified in Minnesota Rules,part 4715.2830,no plumbing work may be <br /> covered prior to completing the required tests and inspections. Provisions must be made for applying an air test <br /> at the time of the roughing-in inspection as outlined in Minnesota Rules,part 4715.2820, subpart 2, of the code. <br /> A manometer test, as specified in Minnesota Rules, part 4715.2820, subpart 3, is required at the time of the <br /> finished plumbing inspection. It is the responsibility of the contractor/installer to notify the Minnesota <br /> Department of Health when an installation for a state contract job, licensed facility, or project in an area where <br /> there is no local administrative authority is ready for an inspection and test. To schedule inspections,contact the <br /> state plumbing standards representative for your region, or call the metro office inspection hotline at 1-800-926- <br /> 6216 (7:30 a.m. to 9 a.m.), or 651/215-0836 (8 a.m. to 9 a.m.)on Monday,Wednesday or Friday. <br /> REQUIREMENT(S): <br /> 1. All plumbing shall be installed in accordance with the Minnesota Plumbing Code (see Minnesota Rules, <br /> part 4715.0320). <br /> 2. The plans indicate that this submittal consists of the above ground portion of the plumbing installation only. � <br /> The below ground portion of this project was reviewed by our office under Plan No. 050479, which was <br /> submitted by a different plumbing contractor. Prior to installation of the above ground portion of the <br /> plumbing system, it must be verified that the underground was installed in accordance with the previously <br /> reviewed plans and the requirements of the Report on Plans for Plan No. 050479 (see enclosure). <br /> 3. Verify that a floor drain without a backwater valve is installed on the individual drain branch serving the <br /> three-compartment sink. <br />
The URL can be used to link to this page
Your browser does not support the video tag.