Laserfiche WebLink
, <br /> � Submit $2,500 escrow nd an escrow agreement signed by the property owner(copy attached). <br /> 5. Keep all structure(s) enclosed and/or secured until such time as demolition is complete. <br /> 6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific prior <br /> approval is obtained in writing for temporary use thereof. <br /> 7. Completely remove foundation(s)from the ground. <br /> 8. Completely dispose of all demolition debris off site in accordance with all applicable PCA requirements. <br /> 9. Abandon water wells in accordance with State Health Department regulations. <br /> 10. Call for an inspection when all debris has been removed, before backfilling. <br /> 11. Within 5 working days of superstructure removal, a final inspection shall be requested. The site shall be <br /> left clean and clear of all debris, with any excavation filled with earth level with the adjacent ground <br /> elevation (except when such excavation is to be used as part of a new building and such new building is <br /> actually under construction). <br /> 12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, crushed <br /> and filled with native soils. An inspection is required after the tanks are pumped and before the tanks are <br /> crushed and filled. <br /> 13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, <br /> employees and assigns from and against all claims, damages, losses or expenses, including attorney <br /> fees, against the City, its agents, employees and assigns arising out of or resulting from the demolition <br /> described herein as performed by the property owner, his employees, agents, subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> �j GG 0 v�D�tiV' �'�����`�y`� <br /> [� $75.00 — P�-tr►cipal Struc�re $ �S • �a <br /> ❑ $50.00 —Accessory Structure x (how many) <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surcharge 1.00 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ '�Io . o� <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do <br /> all the work in a strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all state ents made on this application are complete, true and correct. <br /> Applicant's Signature: �� Date: ��—��� <br /> %,� Owner's Signature: % ►'1�(..K., Date: 'S- � -[ "/� <br /> Approved By: Date: � ` <br /> uilding fficial) <br /> *Zoning Disclosure Required? ❑ YES NO �� —v `O� <br /> "This must be filled out by Zoning Department—For her answer, a Zoning Official must sign all applications. <br /> * Approved By: Date: S'� '�� <br /> Zoning Official) <br /> Form Last Updated. July 2015 <br /> 150784 <br />