Laserfiche WebLink
� . <br /> God,to any extent then such structure may be restored only if a building permit is <br /> applied for within 180 days of the commencement of the destruction. If no permit is <br /> applied for in the 180 days then the structure shall be built in full compliance and <br /> accordance with the provisions of the Zoning Code. <br /> 8. The existing cabin on the property is subject to the provisions in 7) noted above for the 2- <br /> story dwelling; but is additionally subject to the Floodplain Management provisions of <br /> the Code which would potentially require adherence to floodproofing standards such as <br /> elevation of the building, etc. depending on the level of damage to the structure. Note <br /> that merely raising the ground under the existing structure to meet the floodproofing <br /> requirements would not be considered as expansion of a nonconformity, but adding a <br /> basement or changing the size, bulk, envelope or cube of the cabin would likely be an <br /> issue. <br /> 9. The existing cabin on the property does not have a CUP for guest house use, and it is <br /> unknown whether the property qualifies for a guest house CUP because we don't know <br /> whether it has the required 4.0 acres in area. The second dwelling (cabin) on the property <br /> does not qualify as a rental dwelling unit. <br />