My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: problems/fixes/concerns with inspections
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
2090 Shoreline Drive - 15-117-23-23-0001
>
Correspondence
>
Re: problems/fixes/concerns with inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:30:56 PM
Creation date
11/27/2018 1:15:57 PM
Metadata
Fields
Template:
x Address Old
House Number
2090
Street Name
Shoreline
Street Type
Drive
Address
2090 Shoreline Drive
Document Type
Correspondence
PIN
1511723230001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laurel Ulland <br /> From: Laurel Ulland <br /> Sent: Thursday, March 01, 2018 2:15.PM <br /> To: 'David C.Johnson' <br /> Cc: gsmeichels@hotmail.com; Bryan Meyer (bryanmeyerarchitect@gmail.com) <br /> Subject: RE: Martha Head Lake Residence <br /> Attachments: Head Lake Residence_53.0 Structural Issues.pdf; Head 1_Kitchen Beam w_Bolt <br /> Holes jpeg; Head 2_Kitchen Beam w_Bolt Holesjpeg; Head 3_South Kitchen Wall at 6x6 <br /> Post jpeg; Head 4_South Kitchen Wall at 6x6 Post jpeg <br /> Hi Dave, <br /> I received a call from Gary Meichels today regarding the framing inspection at the Head lake residence.The inspector <br /> has two concerns: <br /> • There are a number of staggered %" diameter holes in Beam 1 at the opening between the kitchen and living <br /> room on the main level.This beam is composed of(3) 16" LVLs. Because the LVLs were bowed at installation, <br /> Gary's framing crew bolted the three LVL's together to straighten them out, using 5/8" bolts and washers.The <br /> bolts have now been removed to allow for drywall installation.The framing crew has installed GRK rugged <br /> structural screws in place of the bolts, set flush with the face of the beam.The inspector wonders if the bolt <br /> holes have compromised the beam. Gary is willing to drive%" steel rod into the bolt holes, if necessary. <br /> • In order to install a drain line to the kitchen sink, Gary drilled a 2%' diameter hole through the center of the 6x6 <br /> post, located to the east of the kitchen windows. Again, the inspector wonders if the 6x6 post has been <br /> compromised. <br /> I am attaching a redlined structural plan (53.0) showing the location of the two issues, and photos depicting the current <br /> conditions at Beam 1 and at the 6x6 post. <br /> We would like your feedback and recommendations regarding the two issues and if any remediation is required. If you <br /> would like to talk to Gary directly, he can be reached at 612-210-2286. <br /> Thanks for your help, <br /> Laurel <br /> Laurel Ulland Architecture <br /> � A <br /> www.laurelultand.com <br /> 1718 Logan Ave South <br /> Minneapolis, MN 55403 <br /> 612 377 5984 � m <br /> Laurel Ulland <br /> laurel@laurelulland.com �e <br /> From: David C.Johnson [mailto:Dlohnson@vaaeng.com] <br /> Sent: Friday,July 14, 2017 2:44 PM <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.