My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: bldg permit plans
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
2090 Shoreline Drive - 15-117-23-23-0001
>
Correspondence
>
Re: bldg permit plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:30:56 PM
Creation date
11/27/2018 1:13:33 PM
Metadata
Fields
Template:
x Address Old
House Number
2090
Street Name
Shoreline
Street Type
Drive
Address
2090 Shoreline Drive
Document Type
Correspondence
PIN
1511723230001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cc: Bryan Meyer(bryanmeyerarchitect@gmail.com) <bryanmeverarchitect@�mail.com> <br /> Subject: RE: Martha Head Lake Residence <br /> La u rel, <br /> See attached updated proposal for Martha Head residence. <br /> I took a stab at were we would suggest installing tiebacks for lateral bracing. Please have the engineer review if <br /> necessary. Note that once the tiebacks are advanced thru the organics and soft soils,we are showing a 10 kip working <br /> capacity with a 40'total length. <br /> Contact Mike or I with any questions. <br /> Thanks, <br /> Brian Sanchez, P.E. <br /> Project Manager-Engineer <br /> Atlas Foundation Company� Direct:763-447-4230 <br /> From: Laurel Ulland [mailto:Laurel@laurelulland.com] <br /> Sent:Thursday,July 13, 2017 11:39 AM <br /> To: Brian Sanchez<brian.sanchez@atlasfoundation.com>; Mike Moeller<mike.moeller@atlasfoundation.com> <br /> Cc: Bryan Meyer(bryanmeverarchitect@gmail.com) <bryanmeyerarchitect@�mail.com>; gsmeichels@hotmail.com; <br /> David C.Johnson<DJohnson@vaaeng.com> <br /> Subject: RE: Martha Head Lake Residence <br /> Hi Brian and Mike, <br /> I thought I would check in again about the Martha Head Lake Residence. <br /> The surveyor has staked out the new guest house and pier locations, so we are ready for the helical pier installation, <br /> once the details are confirmed: <br /> • We have determined that the piers will extend to the main floor LVL beams and will be connected with a pier <br /> cap or plate and a steel sleeve. <br /> • A saddle will be used to bolt the LVL's and connect them to the plate.The contractor would like to connect the <br /> saddle in the field to a 9" x 9" x%z" plate that is welded to the sleeve. <br /> • Lateral resistance will be achieved through the installation of battered helical piers at select locations. We still <br /> need to determine where the battered piers will be placed and quantity required. We continue to include our <br /> structural engineer's lateral bracing detail in the construction set, pending a final review of the battered pier <br /> installation. <br /> We have revised the pier plan to accommodate a change in size to a bifold door system that will be installed on the main <br /> level of the house. See attached.The number of piers has not changed but the location of(2) piers has changed for a <br /> larger framed opening above.Total number of piers is 47. <br /> We are available to meet on the job site to review the installation details and access to the site. Let me know when you <br /> are available. <br /> Thanks, <br /> Laurel <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.