Laserfiche WebLink
'� <br /> Melanie Curtis <br /> From: terry003 [terry003@umn.edu] <br /> Sent: Monday, November 22, 2010 3:01 PM <br /> To: Melanie Curtis; Kaimaterry@aol.com; terry003@umn.edu <br /> Subject: Re: Permit <br /> Joseph Terry wrote: <br /> In reviewing our application, it should be kept in mind that if we did not address the faulty drainage immediately <br /> adjacent to our building that causes the wood frames of our door and windows to rot, we would need to replace these <br /> structural elements every few years. <br /> I believe our planned terraced changes to the upper level would actually decrease runoff toward the neighbor's property <br /> and have no effect on drainage toward Lake Minnetonka since most of the lower end of our property on Highway 15 has <br /> an underground stone structure present since 1905 and an intact 1905 stone retaining wall for most of the length of my <br /> property. <br /> Yours, <br /> Joseph Terry <br /> On 11/22/2010 2:25 PM, Melanie Curtis wrote: <br /> Our engineer is currently reviewing your survey. Once we receive his comments we can be ready to issue the permit. <br /> You should be receiving a call this week. <br /> Melanie Curtis <br /> Planning &Zoning Coordinator <br /> City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> Direct Dial: 952.249.4627 <br /> Fax: 952.249.4616 <br /> Planning &Zoning Office 952.249.4620 <br /> Email: mcurtis(c�ci.orono.mn.us <br /> Website: www.ci.orono.mn.us <br /> 1 <br />