My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10042 - new septic system
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
2054 Shoreline Drive - 10-117-23-34-0015
>
Septic
>
2006-P10042 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:27:06 PM
Creation date
11/26/2018 2:45:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2054
Street Name
Shoreline
Street Type
Drive
Address
2054 Shoreline Drive
Document Type
Septic
PIN
1011723340015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
System Specifications <br /> Pump Tank: <br /> • Plumbing shall be run up into riser and back down with a '/4" <br /> drain back hole. <br /> • Floats are to be insta.11ed on a float tree, separate from the <br /> piping connected to the pump. <br /> • A 2.5" Electrical conduit is to be used. <br /> � The 2" force main shall be sleeved with 4" sch 40 and sealed <br /> with 4x2 Fernco, from the pump tank to original soil. <br /> A "Zabel" PDS-PF-1.5/2.0 Pressure Filter or a "Sim-tech" Pressure <br /> Filter is to be insta.11ed in the supply line in the pump chamber, and to be <br /> easily accessible from the ground surface for cleaning. (The pump alarm <br /> will sound when this filter clogs) <br /> If a "Pressure Filter" is not best suited an "Effluent Filter" may be <br /> installed on the outlet of the second tank. This will require a filter alann <br /> or an annual cleaning program. <br /> Plastic bolt down manhole covers are to be used and left at grade level <br /> for maintenance access. <br /> Blowout valves are to be installed on the end of all pressurized laterals. <br /> These will need to be in a protective housing and accessible from <br /> surface grade. <br /> Pressure rate glue joint fittings must be used. <br /> No Fernco's will be used in pressure lines. <br /> If the septic tanks are less than 3' deep the covers are to be insulated <br /> with 2" hi -density foam <br />
The URL can be used to link to this page
Your browser does not support the video tag.