Laserfiche WebLink
Note: It is understood that the price agreed upon 6erein does not include possible ezpenses <br /> entailed in coping with hidden or unknown contingencies found at the job site. <br /> Contingencies include but are not limited to: Inability to reuse eaisting water,vent and <br /> waste pipes; air shafts,duct,grilles, touvers and registers; the relocation of concealed pipes, <br /> wiring and conduits; or imperfections, rotting or decay in the structure or parts thereof <br /> necessitating replacement. The contractor is not responsible for inspection, discovery, <br /> abatement or removal of asbestos or other harmful materials. <br /> This proposal may be withdrawn by us if not accepted within 30 days of the above date. <br /> Contractor• <br /> Owner• Date• <br /> " Owner• <br /> Proposal for Dianne Overgard 6/29/2003 <br /> Most Construction,LLC Page 4 of 4 <br />