Laserfiche WebLink
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday, September 17,2018 <br /> 6:30 o'clock p.m. <br /> Lot 1,which is where the Dunkleys' home is located,consists of one acre. Proposed Lot 2 meets the one <br /> acre size requirement and the 140-foot width at the lake and at the 75-foot setback line. Based on the <br /> configuration,there is an approximate 90-foot buildable envelope at the average lakeshore setback line. <br /> No variances are being requested. <br /> The proposed 20-foot wide frontage connection to Walters Port Lane is proposed for the street frontage of <br /> Lot 2. The applicants are proposing to solely use the Walters Port access as they have been. Lot 2 will <br /> access using the existing Pence Lane shared with the Huelers. Lot 2 provides for a generally flat house <br /> pad to support a reasonable home without encroaching into the side yard setbacks,the lake yard, or the <br /> average lakeshore average. <br /> A delineated wetland near the center of the property impacts the buildable area and limits flexibility for <br /> development of the lot. The delineated wetland does require a buffer as required by the Watershed <br /> District. The lots will be served by city sewer and water. <br /> Over the past year and during the construction of the addition to the Dunkleys' home,there has been <br /> unaccounted and unpermitted movement of dirt and grading. This grading has impacted the"existing <br /> grade"necessary to apply height regulations to the new home. The applicant is attempting to capture and <br /> gain approval of the topographic changes to the property with the proposed plat. There is an area between <br /> the wetland and the driveway where approximately 300 cubic yards of fill was placed. This filling was <br /> not part of the permits for the demolition of the home on 2710 Pence Lane, nor was it included in the <br /> home addition permits. The applicants are also showing an approximate 200 cubic yard stockpile on <br /> Lot 1. This material is also proposed to be utilized along the west side of the driveway. Material has <br /> been added to the stockpile as part of the pool excavation today. A number of trees have been removed <br /> from the property outside of the 75-foot zone. <br /> The City will require the standard perimeter drainage and utility easements around all property boundaries <br /> in the plat and drainage easements over the wetland area and drainageways. Outlot A should also include <br /> the perimeter drainage and utility easements. The final plat drawing should include the drainage and <br /> utility easements. <br /> The preliminary plat should reflect the limits of the existing driveway easement for clarity in the future. <br /> Additional evidence of a driveway maintenance agreement and easements for access to Lot 1 and the <br /> Huelers will be required at the time of final plat. <br /> A park dedication fee is recommended per City Ordinance. The Park Fee is determined as 8 percent of <br /> the fair market value of the land being subdivided but must be between a minimum of$3,250 and a <br /> maximum of$5,550 per residential dwelling unit. The City's assessor will be consulted to determine the <br /> market value of the land for establishing the amount of the fee. <br /> The developer should contact the MCWD and provide confirmation regarding the permits or approvals <br /> they will require for this subdivision. The City's engineer is in the process of reviewing the proposed plat <br /> drawing and comments will be provided prior to being placed on the City Council agenda. <br /> The development is also subject to the 2018 Stormwater and Drainage Trunk Fee of$5,250 per acre. <br /> Planning Staff recommends approval of the preliminary plat. <br /> Page 3 of 22 <br />