My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01081 - new structure
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
1760 Shoreline Drive - 10-117-23-14-0017 (Guest House)
>
Permits/Inspections
>
2017-01081 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:19:41 PM
Creation date
11/14/2018 11:40:31 AM
Metadata
Fields
Template:
x Address Old
House Number
1760
Street Name
Shoreline
Street Type
Drive
Address
1760 Shoreline Drive
Document Type
Permits/Inspections
PIN
1011723140017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> Builder Acknowledgement Form <br /> Permit #2017-01081 / 1760 Shoreline Drive <br /> Builder Representative Name: G��� �' "'C� <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection, a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order ;, )� <br /> will be issued. ��� <br /> Schedule a minimum of one hour for the framing inspection. <br /> �1 S <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to WS <br /> inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must <br /> remain until vegetation has been established. �S <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning <br /> and repair of roadways for any adverse impacts. �5 <br /> No underground sewer within 20 feet of well. <br /> W 5 <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations <br /> must be submitted and approved. 1NS <br /> In the event of winter or other extended unfavorable weather conditions (which prevent the <br /> completion of the exterior improvements and/or as-built survey) a Temporary Certificate of <br /> Occupancy(TCO) may be necessary. A TCO requires a $10,000 escrow. w � <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a <br /> separate Zoning Permit application to be submitted and approved prior to the work <br /> commencing. ws <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the <br /> height of the lower wall require engineered plans and a building permit to be submitted and <br /> approved prior to construction. �� <br /> w:\street files\shoreline drive\1760\builder acknowledgement form 2017-01O81.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.