Laserfiche WebLink
• � L <br /> . Section B i, �� <br /> Ventilation Method <br /> Choose either balanced or exhaust <br /> ✓�alanced,HRV(Heat Recovery Ventilator)or ERV(Energy [�xhaust only(Continuous fan rating in cfm) <br /> Recov-ery Ventilator)—cfm of unit in low must not exceed <br /> continuous venti-lation rating by more than 100%. <br /> �°W°'m� midtap117 High cfm: 192 Continuous fan rating in cfm(capacity must not exceed <br /> continuous ventilation rating by more than 100%) <br /> Directions -Choose the method of ventilation, balanced or exhaust only. Balanced ventilation systems are typically HRV or <br /> ERV's. Enter the low and high cfm amounts. Low cfm air flow must be equal to or greater than the required continuous <br /> ventilation rate and less than 100%greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation <br /> fan must not exceed 80 cfm.)Automafic controls may allow the use of a larger fan thaf is operated a percentage of each <br /> hour. <br /> Section C <br /> Ventilation Fan <br /> Descri tion Location Continuous Intermittent <br /> BROAN HRV 190S Mech.Room <br /> Directions - The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether if is used for <br /> continuous or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the <br /> low cfm air rating and less than 100%greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the <br /> continuous ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a <br /> percentage of each hour. <br /> Section D <br /> Ventilation Controls <br /> Directions-Describe operation and control of the continuous and intermittent venfilation. There shou/d be adequate detai/for p/an <br /> reviewers and inspectors fo verify design and installation compliance. Related trades also need adequate detail for placement of controls <br /> and proper operation of the building ventilation. If exhaust fans are used for building ventilation, describe the operation and location of any <br /> controls, indicators and legends. !f an ERV or HRV is to be installed, describe how it will be insfalled. If it will be connected and interfaced <br /> with the air handling equipment,please describe such connections as detailed in the manufactures'installation instrucfions. If the <br /> insfallation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper operation, such <br /> interconnection shall be made and described. <br /> BROAN <br /> Honeywell <br /> I 2 � <br />