My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-006929 - line to guard house
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
1700 Shoreline Dr - 10-117-23-14-0022 (Main House)
>
Permits/Inspections
>
1995-006929 - line to guard house
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:19:58 PM
Creation date
11/14/2018 9:25:53 AM
Metadata
Fields
Template:
x Address Old
Address
1700 Shoreline Dr
Document Type
Permits/Inspections
PIN
1011723140022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t . . <br /> CITY OF ORONO S�PTIC SYSTEM PERNIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> JOB SITE ADDRESS: /%«� S�c���,•��= %� <br /> Occupancy Type: Residential �� Commercial Other <br /> Permit Type: New or Replacement System, $100.00 <br /> Repair Existing System, $ 50.00 � <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: .�f'�� � J���'�' _ PhoneNuml�er: �r�� – C'v%�% <br /> Mailing Address: i�vn S�U��;;�.�� �` _ City: �%/<�� �-'�; 7ip: <br /> Contractor's Name: �'-�,�I.r-z.� ��y� PhoneNumber: yy� -i��,�— <br /> Mailing Address: ��: �., ��; �� �=,_��= City: -��- .��•-�.� Tlp: S s 3-�'S � <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Pernuts will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br /> � <br /> � �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.