Laserfiche WebLink
., <br /> c <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMTr <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cazds will be sent by return mail after a review is completed. PERMITS ARE NOT VALID <br /> UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical DesiQns - Complete calculations, details and specifications are required for each heating, <br /> ventilation,humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new�construction or remodeling is involved, a sepazate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 473-7357. <br /> Please check one: New Addition Repair X Replace <br /> Residential Commercial <br /> J�B SI'j��i: 1487 Shorline Drive �iP; 55391 <br /> Owner'sName' Robert waaae� TelephoneNumber: <br /> Mailing Address: �; City: Zip:_ <br /> Contractor'sName'Kleve Heating and A/c TelephoneNumber: 941-4211 <br /> MailingAddress' • 13075 Pioneer Trail Cjty:Eden Prairie Zip; 55347 <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantiry: 1 <br /> M1ke: Amana <br /> MOdel: GUC115X50 <br /> Fuel: Natural gas <br /> Flue Size: <br /> Input BTUs: 115,000 <br /> Output BTUs: llo,o00 <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: <br /> Make: <br /> ModeL• <br /> Tons: <br /> H. Power _ <br /> �6�v�rting Oil burning to natural gas and Installing new Lennox gas furnace and 2 zone auto <br /> controls to existing home. <br />