Laserfiche WebLink
,.�- - _ <br /> + � 1� ��'• <br /> i�/� � ,•,`,`�\ <br /> � �.....� �. , . ��1� <br /> � � . �, CITY of U1Z�11�T� <br /> �� :� . <br /> ;I � �•�, ` j�'•`r - �l �i <br /> r'•'� <br /> '�,�; ,� ''•'.,�; ';.;�' ,� ��,,;1/ Municipal O.ffices <br /> ;��" <br /> �� � ' '` � ' ;`�'� �' �'` Street Address: Mailing Address: <br /> ���kEsxp'¢'� 2750 Kelley Parkway P.O. Box 66 <br /> `��"� Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> To: The Cun�ent Owner of Address % �'I /c� S��p�'Q %;'�!� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> � sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. ' <br /> Imminent Public Iiealth Threat <br /> Yes �No <br /> If yes,please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> � System Identified as Non-Compliant <br /> Yes <br /> No ' <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 � <br /> December 31,2010 <br /> Other . <br /> Septic Tank(s ump out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> � - I� �� . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> � ���`,.,� <br /> ���r:.. �:..., ,� <br /> Inspector: Date of Inspection � r� �O �, . <br /> Telepnon2 (9�?) 2=�9-�600 � �at (9�Z)249-�6�� <br /> w•«sa•.ci.osono.mn.us <br />