My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: assessment/sewer connection
Orono
>
Property Files
>
Street Address
>
S
>
Shevlin Drive
>
2160 Shevlin Drive - 03-117-23-34-0019
>
Correspondence
>
Re: assessment/sewer connection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:37:43 PM
Creation date
10/24/2018 1:27:51 PM
Metadata
Fields
Template:
x Address Old
House Number
2160
Street Name
Shevlin
Street Type
Drive
Address
2160 Shevlin Dr
Document Type
Correspondence
PIN
0311723340019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Senior Citizen Deferral <br /> Owners of homestead property who are 65 years or older may apply for a deferment of the special assessment <br /> if they meet the criteria set forth in City Council Resolution#2864. <br /> Sewer Connection <br /> The information below is a summary of information that was provided in a letter several weeks ago. The new <br /> sewer system is now available for connection by property owners. The property owner is responsible for the <br /> sewer connection between the service stub,at the property line,and the house. The sewer connection must be <br /> completed by a licensed plumber, and the plumber must obtain a City sewer connection permit before <br /> beginning work on the sewer connection. The connection permit fee is $35.00. The City does not make <br /> recommendations on specific plumbers to use for sewer connections. It may be prudent to obtain quotes from <br /> several contractors for this work and to also verify contractor references and previous experience. <br /> The Sewer Availability Charge (SAC) must be paid to the City before the plumber can be issued a sewer <br /> connection permit. This SAC fee is submitted by the City to the MCES(Metropolitan Council Environmental <br /> Services) and helps finance the cost of the reserve capacity built into the MCES sewer interceptor system for <br /> new connections. The 2000 SAC fee is $1,100 and this fee has been increasing by $50 each year. The SAC <br /> fee must be paid in the same year that the sewer connection is completed. <br /> The City policy for the time frame for connection to sewer was recently changed.The previous policy required <br /> sewer connection within 16 months after sewer became available. The new policy is that sewer connection has <br /> to be completed at the same date that a nonconforming septic system would need to be replaced. This policy <br /> change was made so as to not force residents, in neighborhoods with newly installed sewer systems, to <br /> discontinue use of a nonconforming septic system any sooner than property owners without sewer. The time <br /> frame for replacement of nonconforming septic systems has also been changed to December 31,2010 on a city <br /> wide basis. In summary,the deadline for connection to sewer for properties with nonconforming septic <br /> systems is December 31, 2010. <br /> These recent policy changes do not apply to failing septic systems with surface discharge of effluent. Failing <br /> septic systems must be replaced or connection to sewer completed within 90 days. The septic systems in <br /> Webber Hills will still be inspected by the City and sewer connection will be required within 90 days for any <br /> systems with surface discharge of effluent. <br /> The existing policy of not allowing the expansion of nonconforming septic systems was not changed. Any <br /> building permits for house additions that would require enlargement of a nonconforming septic system will <br /> require connection to the sewer before completion of the building project. <br /> Properties with conforming septic systems do not have to connect to sewer as long as the systems remains <br /> conforming.Minor maintenance such as pump replacement can be completed,but if the system requires major <br /> repairs, or enlargement connection to sewer will be required at that time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.