Laserfiche WebLink
Henner;n County Rt/Permit-UID#317 / Permit#2017-A234 11/21/17 12:34 PM <br /> Fax: <br /> Email: greg@Icramer.com <br /> Dates <br /> Entrance Needed By: 04/15/2018 <br /> Location <br /> The proposed entrance is on the E side of county road no. 19, 0 miles E of Fagerness point rd, Shadywood road. <br /> Street Address: 1720 shadywood road, Orono <br /> Plat Information <br /> Name of platted addition/subdivision: Shady-Wood <br /> Lot: 13 and that part of lot 12 <br /> Public Land Survey System Information <br /> Township: 117 Range: 23 Section: 17 <br /> Building Information <br /> Zoning Type: Residential <br /> Description: Residential Home <br /> Permit acquired: No <br /> Driveway <br /> Width: 17 feet <br /> Present number of driveways: 1 <br /> Sketch <br /> 32_i�5-001 COS-HANSBERGER 1G ie1% pdf <br /> Description of Work <br /> Move the curb cut from center of property apprximately 18 ft. farther south. See attached survey depicting as-built vs. new. <br /> General <br /> • 1. No work shall be started until the application is approved and the permit issued. <br /> 2. Contact the Hennepin County Permit Office at 612-596-0339 a minimum of 2 business days prior to starting <br /> construction. <br /> 3. After driveway construction is completed, persons requesting the installation must notify the Permits Office that such <br /> work has been completed and is ready for final inspection and acceptance by Hennepin County. <br /> 4. No changes or alterations in entrances may be made at any time without written permission from the County Engineer <br /> or designee. <br /> 5. Approval of this permit does not deny the County Engineer the future right to revise, relocate or close any entrance to <br /> expedite the movements of vehicular or pedestrian traffic. The County retains the right to close said entrance(s) at its <br /> discretion, based upon the necessity for traffic regulation, control and safety. <br /> 6. Existing driveways are not automatically perpetuated. In the event of a change in land use or a major change in the <br /> traffic pattern of the existing facility, new driveway applications may be required by the County. <br /> 7. Inclement weather shall be reason for delay of the project start or suspension of the project as determined by <br /> Hennepin County. <br /> https://roadpermits.co.hennepin.mn.us/entrance.view.php?entrancePermitld=317 Page 2 of 5 <br />