Laserfiche WebLink
6.0 PROCEDURES <br /> 6.1 Soil Qassification <br /> The drill crew chief visually and manually classifiied the soils encountered in the boring in <br /> general accordance with ASTM D 2488, "Description and Identification of Soils (Visual- <br /> Manual Procedure)". Soil terminology notes are included in the Appendix. The samples <br /> were returned to our laboratory for review of the field classification by a soils engineer. <br /> Samples will be retained for a period of 30 days. <br /> 6.2 Groundwater Observations <br /> Immediately after taking the final samples in the bottom of the boring, the hole was checked <br /> for the presence of groundwater. Immediately after removing the augers from the borehole <br /> the hole was once again checked and the depth to water and cave-in depths were noted. <br /> 7.0 GENERAL <br /> 7.1 Subsurface Variations <br /> The analyses and recommendations presented in this report are based on data obtained from <br /> a limited number of soil borings. Variations can occur away from the borings,the nature of <br /> which may not become appazent until additional exploration work is completed or <br /> construction is conducted. A reevaluation of the recommendations in this report should be <br /> made after performing on-site observations during construction to note the characteristics of <br /> any variations. The variations may result in additional foundation costs and it is suggested <br /> that a contingency be provided for this purpose. <br /> It is recommended that we be retained to perform the observation and testing program <br /> during construction to evaluate whether the design is as expected, if any design changes <br /> have affected the validity of our recommendations, and if our recommendations have been <br /> correcfly interpreted and implemented in the designs, specifications and construction <br /> methods. This will allow correlation of the soil conditions encountered during construction <br /> to the soil borings and will provide continuity of professional responsibility. <br /> 7.2 Review of Design <br /> This report is based on the design of the proposed structure as related to us for preparation <br /> of this report. It is recommended that we be retained to review the geotechnical aspects of <br /> the design and specifications. With the review we will evaluate whether any changes have <br /> affected the validity of the recommendations and whether our recommendations have been <br /> correctly interpreted and 'unplemented in the design and specifications. <br /> 7.3 Groundwater Fluctuations <br /> We made water level measurements in the borings at the times and under the conditions <br /> stated on the boring logs. The data was interpreted in the text of this report. The period of <br /> 9 <br />