Laserfiche WebLink
. . - . . . <br /> Series 100 <br /> installing and Leveling <br /> � <br /> �.� � 4 Rails <br /> �.� �� , . <br /> � ��°.� "�`�', � `;�'� � <br /> ��,ti�t��� � <br /> � F A' �^".�� r ���.����rc�k��`�'����� ���.�5���.+!�F"� ��..�`��� <br /> .. "`>� ° ' ' ' 1) Set all of the rails into the attachments <br /> ��. �- � ,��� , � �;`= • � by snapping the channel nuts into <br /> 4,`.� <br /> �,�r, ` '�" �` the side channel of the standard rail. <br /> �, , <br /> " � ` �; Connect multiple lengths of rail end <br /> � ' ��- `� ���'��,��� � : to end with the SnapNrack splice. <br /> �� = .� � �,�,� �� �� �- <br /> ����*' , �', :�, r�-- <br /> 2) Find the highest attachment point <br /> of the roof, and set that attachment <br /> point to the lowest adjustability. Level <br /> � . � � � the bottom rail of the array to the <br /> roof by tightening attachment points. <br /> � Torque silver hardware to 10-16 ft-Ibs <br /> �'�``""""`�"`-,�x�''�� and black hardware to 7-9 ft-Ibs. <br /> �.. �,�-� u� <br /> �'�'�",=r�r,�`�,�` -�.� a.�� .:- .� <br /> ��� �:' 3) Using a string line or spare rails run <br /> �� '� �r� P �� �`°� { � from the bottom rail to the top rail and <br /> � �-� � d, , <br /> �"�� ` � .. ,.:.,�.�_ �:�' raise the top rail, then set the desired <br /> �"��'�'' f F �_ " `�"° pitch of the array by adjusting the top <br /> r���� ��� � <br /> � ��:����� � <br /> � -� �:� rail. Add leveling spacers if needed. <br /> ; � - <br /> �'., r'. `�# �fE^Ey �b �� ;� <br /> � ,�,�� , ,���� �� � . y� . , ; 4) Level the top rail by moving the string <br /> �'�` line down the length of the rail, matching <br /> pitch over the entire length of the array. <br /> 5) Level the remaining rails to the <br /> " " " • ' " string line, working out from the middle <br /> • • rail. Add leveling spacers if needed. <br /> _ �a-�~ ;� � 6) Tighten all racking hardware, torque <br /> silver hardware to 10-16 ft-Ibs and <br /> � "�45���� `�,, , all black hardware to 7-9 ft-Ibs. <br /> � ' z�� <br /> ���r� � �1 <br /> ... � � <br /> �AY4 'x <br /> d ?+� <br /> * ���;. <br /> ' ..�ro�.. �R <br /> • <br /> Y`���;X E�;'{'; <br /> �� � � � � � -SnapNrack engineered systems should <br /> ..,.- . . . ..- - <br /> - ;� �` __ �� _� � � _ only be used with SnapNrack components <br /> ���r � _ and hardware. Any alternate application <br /> ��� 3'� �' may void the warranty and structural <br /> � ��� , <br /> ��. " • - •- - • • • - calculations could become invalld. <br /> �' . .. <br /> . . •• . - •. - • • • - . <br /> ��e�E z l ��[`:€'�€g;. <br /> l .� -� �;,� � � � � �� ���� -If a pilot hole is drilled and a rafter is not <br /> � �,;.. <br /> .�q,+�, found immediately seal pilot hole with <br /> __ '�'� ���J roofing sealant to avoid water damage. <br /> p. �� -Do not over tighten hardware. <br /> • • r. .i ,,'Y'��. � -Always wear fall protection and safety gear <br /> . �ri�l. <br /> ''���� <br /> .. `!� i <br /> ���� _ I. ���r��_��� ���:�c��:� <br /> �r,� � SnapNrack has a suite of design tools <br /> `��, �• � � � � to help configure your PV installation <br /> : J � � � .. for accurate and fast install. Please <br /> visit us at: www.SnapNrack.com <br />