Laserfiche WebLink
. <br /> �o�p CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> ��, G�� No. b � 1 5 <br /> j�kE5H�4� <br /> 11. "The granting of the proposed variance will not in any way impair health, safety, comfort or <br /> morals, or in any other respect be contrary to the intent of this chapter."This criterion is met. <br /> 12. "The granting of such variance will not merely serve as a convenience to the applicant, but <br /> is necessary to alleviate demonstrable difficulty." Due to the lakeshore setbacks there does <br /> not appear to be enough width available on the Property to result in a functional width <br /> home which conforms to the 15-foot fill requirement. The nearly in-kind reconstruction of <br /> the existing detached garage is located in a logical spot on the Property. The site <br /> constraints serve as a practical difficulty. <br /> CONCLUSIONS. ORDER AND CONDITIONS: <br /> Based upon one or more of the above findings, the Orono City Council hereby <br /> grants variances to the following: <br /> • Orono Municipal Zoning Code Section 78-330 to allow redevelopment of the Property which <br /> has a lot area of 36,785 square feet where 43,560 square feet is required; a lot width of 127' <br /> measured from the channel to the side lot line where 140' in width is required; and a rear <br /> setback of 24 feet for the new detached garage where a 30 foot setback is required; and <br /> • Zoning Code Section 78-1125 to allow fill material to extend less than 15 feet from the house <br /> elevated above the floodplain on fill; and <br /> • Zoning Code Section 78-1279 and 78-1680 to allow 1,665 square feet of hardcover including <br /> the detached garage to be constructed 40 feet from the OHWL where a 75 foot setback is <br /> required; and <br /> • Zoning Code Section 78-1434 to permit the reconstruction of an existing nonconforming <br /> building with an upward expansion to increase the total peak height 3.5 feet, subject to the <br /> following conditions: <br /> 1. Council approval is based on the survey by Advance Surveying & Engineering Co., dated <br /> October 28, 2016 and building plans submitted by the Applicants and annotated by City <br /> staff, attached to this Resolution as Exhibits A� B. Any amendments to the plans which <br /> are not in conformity with City codes may require further Planning Commission and City <br /> Council review. <br /> 2. Authorities granted by this resolution run with the Property not with the Applicants, but are <br /> permissive only and must be exercised by obtaining a building permit for the new <br /> construction and commencing construction of said project. A framing inspection must be <br /> 5 <br />