Laserfiche WebLink
! �. <br /> Christine Mattson <br /> From: Christine Mattson <br /> Sent: Thursday, September 06, 2012 9:45 AM <br /> To: 'mbarrett@mollerbarrett.com' <br /> Cc: Melanie Curtis <br /> Subject: 2771 Shadywood Road/#2012-00695 <br /> Mike, <br /> Unfortunately there is not a less costly option for Mrs. Ogle. <br /> In 1984 the Ogle's applied for and were issued a conditional use permit to construct retaining walls, planter <br /> retention basins and to alter the grade within 75' of Lake Minnetonka. As a result of the resolution, their <br /> property was allowed to exceed the allowed hardcover for the respective zones. <br /> On July 19, 2012, our building inspector caught the landscaper working without a permit. A requirement of the <br /> after-the-fact permit was an as-built survey and hardcover calculations to confirm the property is at the allotted <br /> hardcover limitations set in 1984. <br /> If the landscaper had applied for a permit prior to starting the work, our permitting process requires a survey <br /> showing the current or existing conditions and as well as an as-built survey once the project was complete. <br /> If you have any additional questions, please don't hesitate to contact me. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelly Parkway = Orono ; MN ; 55356(physical addressJ <br /> PO Box 66 i Crystal Bay ': MN i 55323-0066 (mailing addressJ <br /> S 952.249.4620 ': 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: Monday, November 12, 2012 <br /> From: Michael Barrett [mailto:mbarrettCc�mollerbarrett.com] <br /> Sent: Tuesday, September 04, 2012 1:05 PM <br /> To: Christine Mattson <br /> Subject: 2771 Shadywood Road <br /> Christine, <br /> We spoke and exchanged some e-mails previously regarding 2765 Shadywood tear down issues. I believe I let you know <br /> that the owner of 2771 Shadywood is also a client of mine. She is a recent widow and growing into the responsibilities <br /> that her husband handled before. I met with her last week and she discussed with me that the City of Orono is <br /> requesting an As-Built Survey of the property. She requested quotes from two survey companies. One quote was for <br /> $3,200 and the other quote was for$2,900. She was surprised at the costs of the surveys. I offered to Marlys to <br /> � <br />