My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#6397-variances/CUP-2014
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Road
>
2765 Shadywood Road - 21-117-23-24-0060
>
Resolutions
>
#6397-variances/CUP-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:05:44 PM
Creation date
10/19/2018 9:29:43 AM
Metadata
Fields
Template:
x Address Old
House Number
2765
Street Name
Shadywood
Street Type
Road
Address
2765 Shadywood Road
Document Type
Resolutions
PIN
2111723240060
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Foundation and S ng-Notes end Specifications - ' <br /> Site Preparation Notes Planting Notes IContinued) Screening Plant(ng Materlal Sthedule <br /> t Contractor shall remove the existing tur(grass in the spxified area using a sod-kicker 3. Contractor shall layout the planc matertals In the specified locations for approval by Material QTY Unit <br /> or a mechanlcal sod cutter.The u�derlying soils shall not be unnecessanly disturbed. landscape designer prior to installation. Edging�Black Plastic:50'roll) 140 If <br /> 2. Contractor shal�remove all leaves and loose debris prior to planting. 4. Contractor shall install all plant materials as specified In the relevant plan and cross fdging Spikes 35 each <br /> 3 Contractor shall cut and remove all(nvasive trees and shrubs that have been marked by the section detail. Double-Shredded Hardwood Mulch(3"depih� 36 cy <br /> landscape designer,leaving a stump no higherthan 3"above grade The stumps 5. If contatner grown,gently slide plant out of container and scarify any rootbound <br /> shall be brush-treated with undiluted Garlon concentrate immediately after the cut plants without damaging more than 10%of existing root mass. <br /> has been applied 6. Ball and burlap trees and shrubs must have the wire basket removed and the burlap Foundation Planting Material Schedule <br /> sack loosened from the top 12"of root ball to allow for adequate root growth. (ZTy Unit <br /> Erosion Control Notes 7. Contractor shall Install mulch to a depth of 3"on all specified planting beds.Mulch Materlal <br /> shall be installed prior to planting to preveni compaction and raked to a neat and Edging(Black Plastic:50'roll) 320 If <br /> 1 All construction shall co�form to local and state rules as required Contractor will even finish upon completion Edging Spikes SO each <br /> take all measures necessary to ensure that no sediment leaves the project site during 8. Contractor assumes respons�bility for replacement of all plant materials that die Double-Shredded Hardwood Mulch�3"dep[h) Z 1 �Y <br /> construction.The specified sediment control devices must be Installed In conjunctlon within one year of inztallation.All replacement plant materfals shall have an Z^Thick Chilton Flagstone S[eppers 2 Tons <br /> with all clearing in a manner as to ensure that sediment and sediment laden water additional one year warranty for replacement. <br /> do not enter the drainage system,roadways,or violate applicable water standards <br /> 2 All temporary erosion control devices will require maintenance while they are installed. Sc►eening Plan-Plant LiSt <br /> The Contractor shall routinely check these devices for sediment buildup,vandalism, $IZE SPACING <br /> and general operabiliry.The Contractor is responsible for inspectinq these devices on QTY Botanical Name Common Name <br /> a daily basis and after every rain event.Sediment shall be removed when it <br /> reaches 1/3 the capacity of the device.Maintenance,cieaning,sediment removal, Trees and Shrubs <br /> and final removal of the temporary erosion control device are Incidental expenses 15 Cornus sericea'Isanti' 'Isanti'Dogwood #2 Cont. 48"O.C. <br /> assumed by the contractor. ri2 Cont. 30"O.C. <br /> 3. Contractor shall lay not leave any areas of exposed soil unattended for more than 3 Hammamelis virginiana Witch Hazel <br /> 48 hours. 8 Viburnum dentatum'Morton' 'Morton'Arrowwood Viburnum #2 Cont. 60"O.C. <br /> 4 All work shall be completed using hand tools or Iight mechanical equipment(i.e. <br /> no skid loaders or tracked vehicles The contractor shall get approval from Foundation Plenting Meterial Sthedule <br /> the landscape designer for any questionable equipment. <br /> 5 Contractor shall maintain the spxified coir erosion control blanket in place during QTY Botanical Name Common Name SIZE SPAC�NG <br /> planting to prevent soil disturbance and slope failure.Contractor shall cuf the coir <br /> blanket as needed to install plant mater�al as specified. <br /> 6 The implementation of erosion control actrvities and the construction,maintenance, ShtubS <br /> replacement,and upgrading of the specified devices is the responsibility of the 1 Amelanch�erx grandifloro 'Autumn Brilliance'Serviceberry #20 Clump <br /> contractor until all construction is completed and approved. 12 Buxus'Green Mountain' 'Green Mountain'Boxwood �12 Cont. 36"O.C. <br /> 7 The specified erosion and sediment control devtces shall be inspected daily by the 1 Cornus alternifolia Pagoda Dogwood #10 Clump <br /> contracror and malntained as necessary to ensure their continued(unctlon.All #2 ConL 48"O.C. <br /> disruptlons to their continued function shall be repaired within 24 hours maximum. 9 Cornus sanguinea'Cato' 'Arctic Sun'Dogwood g2 Cont. 30"O.C. <br /> B These plans depict minimum erosion and sediment control BMPs Additional BMPs 15 Dievilla lonicera Owarf Bush Honeysuckle <br /> may be necessary as site or climatic conditions change. 4 Forsythia'Cowtaneur' 'Gold Cluster'Forsythia #2 Cont. 42"O.C. <br /> 16 Ribes alpinum Alpine Currant #2 Cont. 42"O.C. <br /> Planting Notes 7 Viburnum den[atum'Chnstom' 'Blue Muffin'Viburnum #2 Cont. 60"O.C. <br /> t. Contractor shall provide the landscape designer with the opportunity to Inspect all 1 V�burnum triolobum'Bailey Compact' Compact Highbu5h Cranbeffy #2 Cont. <br /> specified plant materlals. Advfse landscape designer of source of plant ma[erials. <br /> Plant materlals to be nursery grown stock unless otherwise noted.Plants shall meet perennials <br /> or exceed ANLA specifications appropriate ro the plant type.Landscape designer 18 Ajuga reptans'Chocolate Chip' 'Chocolate Chip'Bugleweed 4" 12"O.C. <br /> reserves the right to reject any provided materfals at the contractor's expense. <br /> 2 Plants and pot sizes shall be as specified In the plant Iist If substitutfons are requlred, 134 Hemerocallis'Boadcious Returns' 'Bodatious Returns'Da lillies #1 Pot 18" • • <br /> contractor must get approval from the landscape designer. 18 $edum spp.AutumnJoy' 'Autumn Joy'Sedum kl Pot 18"O.C. <br /> 3o Sporobolus heterolepis Prairie Dropseed Nl Pot 18"O.C. <br /> p� to' zo' ao' � � � <br /> ��C� o <br /> Non-Cost Share Plantings and Material n�� O <br /> Schedules ThomasRandgaard Designer:SamuelGeer �„A�� ���0�711r1 <br /> 2765 Shadywood Ln Date:6/19/13 J <br /> Orono,MN <br /> �� <br /> W <br /> � <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.