My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-15-2018 Planning Commission Packet
Orono
>
Planning Commission
>
2018
>
10-15-2018 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:33 PM
Creation date
10/18/2018 3:01:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.01-3.50 1,400 2,800 <br /> 3.51-4.00 1,600 3,200 <br /> 4.01-4.50 1,800 3,600 <br /> 4.51-5.00 2,000 4,000 <br /> 5.01-6.00 2,200 4,400 <br /> 6.01-7.00 2,400 4,800 <br /> 7.01-8.00 2,600 5,200 <br /> 8.01-9.00 2,800 5,600 <br /> 9.01 or more - 10.00 3,000 6,000 <br /> 10.01 – 11.00 3,200 6,400 <br /> 11.01 – 12.00 3,400 6,800 <br /> 12.01 – 13.00 3,600 7,000 <br /> 13.01 – 14.00 3,800 7,000 <br /> 14.01 or more 4,000 7,000 <br /> *Excluding nonroofed tennis courts, sport courts, pools, paddocks, arenas. <br /> (3) Any oversized accessory structure OAB shall be subject to the following conditions: <br /> (pPrincipal structure building setbacks must be met}. Further, no such structure OAB <br /> shall be nearer the front lot line than the front line of the principal residence building <br /> on the property, and no such accessory structure shall be located lee's than 30 feet <br /> from the side or rear lot line regardless whether less strict principal structure <br /> b. The maximum height for such accessory structure building shall be 30 feet or the <br /> defined height of the principal residence structure building on the property, <br /> whichever is less. <br /> c. Such structure An OAB shall be allowed only when the property owner agrees and <br /> covenants in writing with the city as follows: <br /> 1. No future subdivision will be approved that places the OAB within a lot that has <br /> no principal structure building, except that the city in its subdivision approval <br /> may grant a finite time period in which the oversized accessory structure OAB <br /> may remain without a principal structure building, in order that a principal <br /> building may be constructed. At the end of this time period, the oversized <br />
The URL can be used to link to this page
Your browser does not support the video tag.