<�, t�� <br /> �- .. �'. <'� �:' � t 2 3 � <br /> SPECIAL PROVISIONS ����'` ��� � ���� � � - <br />, ,�,r . . '"�- , , ,n.w,. . , <br />�<� (ROADWAY SURFACE) <br />� A. CONCRETE PAVEMENTS <br />�` 1. Openings �-x��� <br /> The opening made in a concrete pavement must be so located that no side is within three (3) feet of a construction joint. If the <br /> side of the opening is within three (3) feet of a construction joint,the concrete pavement must be removed to the joint. Before <br /> 4' <br /> breaking the concrete, the slab must first be cut with a concrete saw to a depth of not less than two (2) inches,and the exact '"; <br /> 't%. <br /> location thereof must be approved by the Hennepin County Department of Transportation.All broken concrete must be removed <br /> from site and disposed of. � <br /> NO OPENINGS SHALL BE MADE IfV PORTLAND CEMENT CONCRETE DURING WINTER MONTHS EXCEPT FOR � <br />�' EMERGENCIES. IF OPENING HASTO BEMADE,ADJACENTEDGESWILL HAVE TO BE REMOVED ONE FOOT BEYOND <br /> ORIGINAL EXCAVATION THE FOLLOWING SPRING AND REPLACED BY A PERMANENT PATCH. <br /> 2. Backfill and Compaction <br /> After the excavation has been completed, the requirements for the backfill, i.e., kind of material,compaction,etc.,shall be the <br /> ,� same as specified for the repairs made for "Trenching or Sub-surface Operations". (See paragraph "C" below). <br /> r�`� 3. Replacement of Concrete <br /> The concrete used for the final surface repair shall consist of 3A42 high early strength concrete to meet Minnesota Department �n. <br /> �; <br /> of Transportation Specification dated 1983, Spec. No. 2301. This concrete to be secured only from commercial plants which <br />�s-« can furnish a mixture that is approved by Hennepin County. The final finish must be burlap dragged or broomed so that it will <br />�" match the surface of the adjoining concrete slab, and cured with plastic paper. All construction joints shall be replaced. The <br /> fresh concrete patch shall be protected from all traffic contacts for at least 72 hours after it has been finished. � <br /> B. BITUMINOUS PAVEMENTS � <br /> 1. Openings � <br /> When necessary to cut openings in Bituminous surfaced roadways, the size of opening and location thereof must conform to � <br /> size and location specified in the permit, or to size specified by Hennepin County.When cutting the opening,the edges are to be � <br /> cut in a straight line, and sides to be smooth and vertical. No ragged edges permitted. Cutting to be done with saw, jack- � <br /> -� hammer, spades or similar approved tools.All excavated bituminous material to be removed from site and disposed of. No open- � <br /> - ings shall be made in bituminous pavements during winter months except for emergencies. <br /> 2. Backfill and Compaction � <br /> After the excavation has been completed, the requirements for backfill, i.e., kind of material, compaction, etc., shall be the <br /> same as specified for the repairs made for "Trenching or Sub-Surface Operations". (See paragraph "C"below.) <br /> x� 3. Replacement of Concrete Base � �. <br />�'p. �'`r�` e <br />�-;� Use procedures listed under A-3. Allow the concrete to cure for 48 hours before placing bituminous materials. � R <br />��`.` 4. Bituminous Tack Coat �� <br />��"`, A tack coat shall be applied to all adjacent bituminous and concrete faces before placing the bituminous surface course. �� <br />�R 5. Restoration of Blacktop <br />'.'�'v� All blacktop surfaces are to be restored as soon as possible after backfilling has been completed. Bituminous surfacing material <br /> may be obtained from most commercial "Blacktop" plants. The kind and grade must be approved by the Hennepin County �`= <br /> Department of Transportation. Replacement of the bituminous material shall be made in layers not to exceed two (2) inches in <br /> � <br /> depth,each layer to be compacted with an approved roller or vibrating tamper unless otherwise specially authorized. <br /> 6. Damage to Blacktop <br /> Any blacktop area which has been scarred by equipment, lugs, cleats, teeth, etc., shall be replaced or repaired as directed by <br /> Hennepin County. <br /> � <br /> �,;, <br /> C. TRENCHING OR SUB-SURFACE OPERATIONS � <br /> 1. Openings <br /> Trenches for conduits, water, steam, oil and gas pipes, sewers and other utilities placed within the right of way shall be located � <br /> as approved by Hennepin County. Trenches for construction along the highway shall not be opened for a distance of more than <br /> 300 feet at any one time,unless especially authorized. � <br /> � 2. Storage of Excavated Materials `� <br />` Excavated or other material shall be placed or stored on the side of the operation farthest from the traveled road unless other- � <br />�* wise authorized by Hennepin County,and in such manner that there will be no interference with the flow of water in any gutter, �.; <br /> "�> drain,pipe,culvert,ditch or other waterway. ��v <br /> ._;J;' :�? <br /> 3. Backfill and Compaction � <br /> After excavation has been completed, it may be refilled with the excavated material which has been removed,with the following 3 <br /> exceptions: <br /> $� If the excavated material consists of mucky,soft or unstable soil, boulders,or large rock, it must be removed and disposed '� <br /> `i of outside the county right of way, and replaced with granular (sandy) material. `� <br /> � <br /> '�i The refilling of the trench shall be done with Class 3 gravel or other approved material compacted by the ordinary compaction � <br /> � method and shall follow as rapidly as possible the placing of sub-surface structures and shall be completed in such manner as <br /> will conform to the earth shoulder or subgrade or as directed by the Hennepin County Department of Transportation. � <br /> �.� a <br /> ?��' 4. Replacement of Gravel Base � <br /> x; <br /> 'r_�i' The gravel base shall be replaced with approved material and compacted. All compaction must be in accordance with the Minne- "� <br /> ' sota Department of Transportation Specifications dated 1983,Section 2105.3F2 "Ordinary Compaction Method". s� <br /> i� � <br /> � _�_..�,� <br />