Laserfiche WebLink
� . . <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL <br /> YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON <br /> THE JOB SITE. <br /> 3. Mechanical Desi� - Complete calculations, details and specifications are required for each heating, <br /> ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shaIl also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. <br /> 6. All work must be inspected (rough-in and final). Call 249-4600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600. <br /> Please check one: New Additio Repair Replace <br /> Residential Commercial <br /> JOB SITE:�,E�(���� ��(, a�y,�� ���t�t,����� �,� Zip: <br /> Owner's Name: �.9 v,� �N�GUN elephone Number: C)5�-��/--0 7"�� <br /> Mailing Address: �' ,-,�.� ! City: �'/�i,qp,��, Zip: <br /> Contractor's Name: Telephone Number: �7�,/-�� <br /> Mailing Address: 1 (� /,J,a� -r City: 'L Zip: �33/ <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make: r�„v,v�� <br /> Model: ��3,�✓��/��' <br /> Fuel: �C/�4 T <br /> Flue Size: 3" �C. <br /> Input BTUs: /��� ('jcf� <br /> �� <br /> Output BTUs: <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: � <br /> Make: �f,,✓,�/�� <br /> Model: /�S� (�� .. <br /> Tons: �r- <br /> H. Power <br />