Laserfiche WebLink
�I�er YvtOt�I� S i` � �. <br /> PLAN REVIEW CHECKLIST FOR � '"'"• cit•�vt.��-� <br /> Address: �w��� � �� <br /> 2-�'�? Sk�__T. Permit No. L-���j -��� <br /> � <br /> Description of work: �( '��,(Il,� Date Rec'd: ( Z-" �'� <br /> 1 <br /> Septic review by: N f''1' Date Approved: <br /> Zoning review by: 1,.Y1V��,Q�Y�--" Date Approved: ��- ��O <br /> Building review by: 1`�Oul,1� �� 1�D Date Approved: `t`��' '��p <br /> Grading review by: N t"s' Date Approved: <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot Coverage: SF % <br /> Survey Submitted: � Yes � No Date of Survey: Revised date(?): <br /> Landscape plan submitted? 0 Yes � No Landscaper: <br /> Proposed Setbacks: <br /> Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> Defined Height: Peak Height: FFE: FFE minus 6 feet= (Existing Contour) <br /> Perimeter(linear feet) = 50% _ � F. below grade <br /> Basement? ❑ Yes 0 No, Stories ���""_ ��) n ` <br /> t�-• <br /> + <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: , �_ �J� ,�f� 1ATION: <br /> f �u ` , �i <br /> The distance between the lowest proposed V�`^�� .� Slab at or above grade- <br /> floor(of the basement or crawl space)and measure from hiQhest existinp <br /> START WITH the highest point of the roof. i�r � �-�m� rp ade to the highest point of the <br /> � roof even if fill was brought in to <br /> �levate home. <br /> If you have a... <br /> SUBTRACTION • GABLE OR HIPPED ROOF(no Slab below grade-measure <br /> (BASED ON windows): Subtract half the distance from highest exis grade to the <br /> ROOF TYPE) between the highest point of the roof -_"'-� hi hest oinf the roof. <br /> to the low point of the corresponding If you_J�aVe a... <br /> gable or hipped roof SUBTRACTION ' ' GABLE OR HIPPED ROOF <br /> • GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> windows): Subtract half the distance ROOF TYPE) the distance between the <br /> between the top of the highest highest point of the roof to <br /> window and the highest point of the the low point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, . GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance between <br /> (BASED ON basemenUcrawl space floor and the the top of the highest <br /> EXISTING highest existing grade adjacent to the window and the highest <br /> � GRADES) foundation OR 10 feet(whichever is less). ��� point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />