Laserfiche WebLink
Aladdin <br /> Plumbing <br /> Plan No. 100929 <br /> Page 2 <br /> December 30,2009 <br /> 5. Materials used for water distribution piping must comply with the standaxds specified in Minnesota Rules, <br /> part 4715.0520. Copper water distribution piping must meet ASTM Standard B88. <br /> 6. Materials used for drain,waste, and vent systems must comply with the standards specified in Minnesota <br /> Rules,part 4715.0570 through part 4715.0600. <br /> 7. The water distribution system shall be disinfected in accordance with Minnesota Rules,part 4715.2250. <br /> 8. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820. <br /> NOTE(S): <br /> 1. The scope of this project consists of remodeling an existing building. Installation includes a kitchen sink <br /> and all associated waste,vent,and water supply piping. <br /> 2. The building is served by existing municipal sewer and water services. <br /> 3. The plans and specifications were prepared by a licensed plumber. Only the plumber who has prepared the <br /> plans may use the plans for construction. If another plumber is contracted to install the plumbing,they must <br /> submit their own plans and specifications for the proj ect. <br /> 4. This plan review is for the plumbing systems only and does not pertain to the licensing requirements for the <br /> facility. The licensing authority will report separately on any licensing requirements which must be met. <br /> Additional plans,information and fee may be required by the licensing authority for their review. Please <br /> note that changes to the plumbing system may be required as a result of their review. Revised plumbing <br /> plans must be submitted showing any significant changes to the plumbing system. <br /> Authorization for construction in accordance with the approved plans may be withdrawn if construction is not <br /> undertaken within a period of two yeazs. The fact that the plans have been approved does not necessarily mean <br /> that recommendations or requirements for change will not be made at some later time when changed conditions, <br /> additional information, or advanced lrnowledge make improvements necessary. <br /> Approved: <br /> r <br /> C�__ �-_-�, �.��--- <br /> Corey A.Frain,P.E. <br /> Public Health Engineer <br /> Plumbing Plan Review and Inspections Unit <br /> 443 Lafayette Road North <br /> St. Paul,Minnesota 55155-4343 <br /> 651/284-5882 <br /> CAF:jat <br /> cc: Center Point Plumbing LLC <br /> Aladdin,Inc. <br /> Mr. Lyle Oman,Building Official S� <br /> Ms. Susan Palchick,Director,Hennepin County Environmental Health <br /> File <br />