Laserfiche WebLink
��'c.0 t G us4..o�f'�o n� (2�4 i-z�(.s o(Z Csz.c L,, <br /> 8. FR.AMING GUR� 6. x.��a ��� <br /> From two treated 2 x , wa1� <br /> joists: 119" for an 10' building,143' for � <br /> a 12' building or 167" for a 14' f�ss T.��� <br /> i�eso. <br /> building. Place the rim joists 10' apart <br /> in the area where the shed is to be set T''"°'d <br /> Stand the front and back walls up at =�~� <br /> joists(so' <br /> the prbper ends of the rim joists. Nail � <br /> rim j oists to the end walls using 1 Od =I� �s=, <br /> w � <br /> nails. Temporarily brace both ends. � <br /> See Figure 6. Stand the remaining ��'"'u� <br /> �.ua+�s.� <br /> frames up. 4 for a 10' building, 5 for a Ih"s.�•:4' <br /> 12' building or 6 for a 14' building. i� <br /> Nail to rim j oists at dimensions shown. . <br /> Place a temporary brace across the -:• �,�� . <br /> roof fr-ame members. r...�� ' �;. �s+ <br /> blfa , �?ti <br /> q. SQUARE THE SUILDING. ����'� `�, <br /> See Figure 7. / � :� <br /> ����' ��, �,�o�' <br /> �a s At base of building, � �. <br /> measure diagonally . � <br /> Adjust building until °�Y� - �b ` "` "'�'�'" '��' Z"x4" <br /> D C AC=BD. Buildirig 1S �1eri r.�''-' s �Ioor <br /> A�r'r��? <br /> FIGURE 7. square. "�t�Pt�i',� . � �p�� <br /> N l'�T r�,� Toe r.ait in <br /> io. FLOOR SUPPORTS �����so uar�m��� C� <br /> s,� ��ti �►���roua, .. � <br /> From the remaining treated 2x4's, cut fc�n,�r�r� p� _ � �k� � (��) <br /> 21-1/4" floor supports and the require���ai�.�d� ��� `'�-;�- � "'��: Z n�- Y:�-_ <br /> 22-1/2" floor supports, 6 for a 10' building, 8 for a I"�4«xe"le <br /> 12' building or 10 for a 14' building. Install as � <br /> shown in Figure 8, using l Od nails. � plstes at (� <br /> top and <br /> ie bottoaa fotd <br /> i�. FLOOR SHEATHING `� ��� <br /> NOTE: Floor sheathing must be notched �i ��"�� <br /> 1- 1/2"x3- 1/2" to fit around side wall frame �Gjj� g. <br /> members. Stagger end butt joints front to back. i1-ua"�"�_"_'"'�"" �'-�w ==•�4w <br /> IO• Building: From one 4'x8' sheet of floor sheathing, cut two pieces 24" x48" wide. From <br /> another 4'x8' sheet, cut one piece 24" wide by 96" long and one piece 24"�4". Use two more full <br /> sheets. Nail in place using 8d nails 8" on center. <br /> 12• Bu�lding: From one 4'x8' sheet of floor sheathing, cut two pieces 48"x48". From another <br /> 4'x8' sheet, cut one piece 24"x96" and one piece 24"x48". Use two more full sheets. <br /> 14' 8�1�� �'om two 4' x8' sheets of flooring, cut two pieces 72" long by 48" wide. From <br /> another 4'x8' sheet, cut one piece 24" wide by 96" long and one piece 24" wide by 72" long. Use two <br /> more full sheets. Nail in place using 8d nails every 8" on center. <br /> IZ. SIDING SIDE WALI.�: NOTE: In order to prevent wicking of moisture into the siding, keep the <br /> bottom of the siding 1" above the bottom of the treated bottom frame member. <br /> io• Bu�lding: Cut flve (5)- 4'x8' sheets of siding to 83" long. Cut one 48"x83" piece into two pieces <br /> 24" wide, leaving 4 pieces 48" wide. Notch the top to fit around the EZ frame overhang. <br /> ZZ• Bx�ilding: Cut six 4'x8' sheets of siding 83" long. Notch the top to fit around the EZ frame <br /> overhang. <br /> 14' B�I�% Cut seven (7) - 4'x8' sheets of siding to 83" long. Cut one 48"x83" piece into two <br /> pieces 24" wide, leaving 6 pieces 48" wide. <br /> NOTE: If T-1-11 siding is used, place cut edges at corners. Make certain end walls and frames are <br /> plumb, (vert�cally level) and then apply siding using 6d nails. <br />