Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Thursday,June 16, 2016 4:12 PM <br /> To: Christine Mattson <br /> Subject: RE:2264 Shadywood Road/#2016-00515 <br /> Approved <br /> From:Christine Mattson <br /> Sent:Thursday,June 16, 2016 10:28 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject: RE: 2264 Shadywood Road/#2016-00515 <br /> We received updated information. Please review and provide comments. <br /> Thank you! <br /> From:Adam Edwards <br /> Sent: Monday, May 23, 201612:33 PM <br /> To:Christine Mattson<CMattson@ci.orono.mn.us> <br /> Subject: RE: 2264 Shadywood Road/#2016-00515 <br /> Chris, <br /> 1've reviewed the site plan and offer the following comments: <br /> 1. Site plan is missing the signature block and signature of whomever prepared it. (Survey Requirement 1.) <br /> 2.The plan does not contain an erosion control plan. (Survey Requirement#24.)The plan should be revised to indicate <br /> perimeter erosion control measures(siltfence, biologs, etc.)down gradient from proposed work. Measures must be <br /> installed by the Contractor and inspected by the City prior to any work.Contractor must provide a minimum 24 hour <br /> notice prior to inspection. This could be annotated by hand on the existing plan. <br /> Adam <br /> From:Christine Mattson <br /> Sent:Thursday, May 19, 2016 1:23 PM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject: 2264 Shadywood Road/#2016-00515 <br /> Adam, <br /> Several variances have been granted for 2264 Shadywood Road. The most recent variance (#15-3787, resolution#6560) <br /> was approved with a site plan,that is not signed or dated. As I understand it,the site plan used the as-built survey dated <br /> � <br />