My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: foundation findings for remodel
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Road
>
2264 Shadywood Road - 17-117-23-43-0124
>
Correspondence
>
Re: foundation findings for remodel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:43:07 PM
Creation date
10/4/2018 11:27:42 AM
Metadata
Fields
Template:
x Address Old
House Number
2264
Street Name
Shadywood
Street Type
Road
Address
2264 Shadywood Road
Document Type
Correspondence
PIN
1711723430124
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�, i���� °7C".�t+j r� ��"�gR�1�. <br /> � � ' � <br /> . � � y <br /> .? ��,, � � a <br /> , .��-. � ,.� v . <br /> "� <br /> 5201 E.River Road February 29,2008 <br /> Suite 308 <br /> Minneapokis,MN 55421 <br /> Tom Ziegler <br /> rei 763-571-2500 2264 Shad ood Road <br /> F�763-571•I168 5'N' <br /> ,�,��g�� Orono,MN 55391 <br /> Subject: Engineer's Recommendation <br /> Deax Tom, <br /> The purpose of this letter is to offer recommendation for the possible <br /> drainage issues that may occur between your proposed building and the <br /> building at 225b Shadywood Road. <br /> It is my professional opiniort that the draintile shown on a survey dated <br /> january 25,2008 will work with some additional measures. The additional <br /> measures are as follows; <br /> -Add draintile leaders to pick up water from downspouts. This will <br /> prevent the inundation of this area due to rainwater direcfily from roof <br /> drainage. The leaders can be solid 4" draintile. This shaIl be a separate <br /> draintiie system from perforated draintile installed on praperty line. <br /> -Add area drain on ttie south end near the 24"walnut tree. This will <br /> serve two purposes;help prevent surface drainage from"ponding"in <br /> this area and provide an access to the draintile for cIeaning purposes, <br /> should it be needed. <br /> -As discussed on the phone,if the 24" walnut is rernoved,it should be <br /> repiaced with trees or shrubs that have a large evapotranspiration rate. A <br /> local nursery wiil have some suggestions. <br /> -The draintile ruru�iung along the properiy Iine should have the following <br /> properties. The trench should big a m;nim�n of 18"wide(typical b�bcat <br /> bucket width)and 24"deep. The ixench shall have a non-woven <br /> geotextile fabric inshalled. The cLraintile shall be 4"perforated with sock <br /> ta prevent sedimentation. The draintile shall be laid in the bottom of the <br /> txench az�d pea gravel shall fs1l the trench to withixi 4"of the final grade. <br /> The geotextile fabric sha11 covex the top of the pea gravel. 4" of native <br /> topsoil shall be placed over the geotextile fabric. (See schematic drawing) <br /> - Wheze draintile daylights to grade,a guard of soxne sort shall be <br /> installed to prevent"critters"from entering. <br />
The URL can be used to link to this page
Your browser does not support the video tag.