Laserfiche WebLink
'� � PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> Address: � Permit No.: U/�((� � (����� <br /> Description of work: ' l<<'ICOI/' Date Rec'd: <br /> Septic review by: Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: " �� Date Approved: � �� l <br /> Grading review by: Date Approved: <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot Coverage: SF % <br /> Survey Submitted: � Yes ❑ No Date of Survey: Revised date ? : <br /> Landscape plan submitted? 0 Ye � No Landscaper: <br /> Proposed Setbacks: <br /> Front (Lake) Rear(Street) ( N S E W ) ( N E W ) Other Buildings Wetland <br /> Side Side <br /> Defined Height: Peak Height: FF . FFE minus 6 feet= (Existing Contour) <br /> Perimeter(linear feet) = 50% = L.F. below grade <br /> Basement? � Yes 0 No, Stor�s <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: ` FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the w st proposed Slab at or above grade— <br /> START WITH floor(of the basement or rawl pace)and measure from hiphest existinq <br /> the highest point of the r of. START WITH rg ade to the highest point of the <br /> roof even if fill was brought in to <br /> elevate home. <br /> If you have a... <br /> SUBTRACTION • GABLE OR IPPED ROOF no Slab below grade—measure <br /> (BASED ON windows): ubtract half the 'stance from highest existing grade to the <br /> ROOF TYPE) between t e highest point of t e roof hi hest oint of the roof. <br /> to the lo point of the corresp ding If you have a... <br /> gable o hipped roof SUBTRACTION ' GABLE OR HIPPED ROOF <br /> • GAB OR HIPPED ROOF(wit (BASED ON (no windows): Subtract half <br /> wind ws): Subtract half the dista ce ROOF TYPE) the distance between the <br /> bet een the top of the highest highest point of the roof to <br /> wi dow and the highest point of th the low point of the <br /> r of corresponding gable or <br /> hipped roof <br /> • LL OTHER ROOF TYPES(flat, • GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Su tract the distance between the half the distance between ' <br /> (BASED ON b emenUcrawl space floor and the the top of the highest <br /> EXISTING h' hest existing grade adjacent to the window and the highest <br /> GRADES) f undation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> �9 EQUALS <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />