Laserfiche WebLink
� e <br /> ' i � <br /> � O� <br /> � � � CITY of ORONO <br /> �:�, Municipal Offices <br /> �1 °- .;;:� � Street Address: Mailing Address: <br /> '�►� ;�` ,y,�' 2750 Kelley Parkway P.O.Box 66 <br /> ,�G Orono,MN 55356 Crystal Bay,MN 55323-0066 <br /> ��k'EsHog' <br /> February 18, 2011 <br /> Steven B. Dore <br /> 6530 Cambridge Street <br /> Minneapolis, MN 55426 <br /> RE: Conformance with Building Permit 2010-00336 <br /> As a result of your recent request for a temporary certificate of occupancy (C.O.), staff reviewed <br /> your building permit and property file in order to define the outstanding issues for the issuance <br /> of a final C.O. According to the approved building permit plans and as noted within Resolution <br /> 5932 (copy attached), your third garage stall is to be no wider than 6 feet. Your property was <br /> limited to no more than 4,040 square feet of hardcover within the 75' to 250' zone. During the <br /> recent inspections and review of your property staff noted that the third garage stall does indeed <br /> exceed 6 feet in width. The increase in size results in an increase to the size of the driveway <br /> which must be accounted for in your hardcover calculations. This falls under "assumed <br /> hardcover"; see the enclosed Hardcover Information sheet. The result of the wider garage door <br /> is that your property now exceeds the approved level of hardcover within the 75' to 250' zone. <br /> The additional assumed hardcover is illegal hardcover and the need for it must be removed. <br /> Additionally according to Resolution 5932, plans for a native shoreline vegetative buffer must be <br /> submitted prior to the issuance of the final certificate of occupancy. These items were noted on <br /> your building permit at the time of issuance. <br /> Before the City will issue a final certificate of occupancy verification of compliance with the <br /> approved plans will be required. An as-built survey is required to be submitted which reflects <br /> the third stall garage door is reduced to no wider than 6-feet and hardcover levels must be in <br /> compliance with approved plans. Further a planting plan for the native shoreline vegetation <br /> planting area must be received and approved by staff— note that a cash escrow will be required <br /> for the plantings to assure viability through a growing season. <br /> If you have questions please do not hesitate to contact me at mcurtisCaa)_ci.orono.mn.us or <br /> 952.249.4627. <br /> Sincerely, <br /> CITY OF ORONO <br /> Melanie Curtis <br /> Planning &Zoning Coordinator <br /> encl <br /> c: Lyle Oman, Building Official <br /> Telephone(952)249-4600•Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />