Laserfiche WebLink
. , ,. <br /> 443 Lafayette Road N. i �� ��r��}�� ��p�,�-����y� p� (651)284-5005 <br /> St. Paul, Minnesota 55155 j � �� � i�i������ 1(80 jDIAL-DLI <br /> www.dli.mn.gov i l�� TTY: 651 297-4198 <br /> � ,. <br /> Division o#'Construction Codes and Licensing REC�IVED <br /> REPqRT ON PLUMBING PLANS <br /> FEB 0 6 2017 <br /> PROJECT: John Henry III, 2500 Shadywo d Road,Orono,Hennepin County, Minnesota, <br /> Plan No. PLB1701-00101 CITY OF ORONO <br /> OWNERSHIP: Ugorets Properties,410 l lth Avenue S,Hopkins,MN 55343 <br /> SUBMITTER: Steve Hauck Plumbing L C, 16413 Jaspar St.NW,Anoka,MN 55303 <br /> Date Received: January 19,2017 <br /> Date Approved: February 2, 2017 �� <br /> This review is limited to the provisions of th�Minnesota Plumbing Code,Minnesota Rules, Chapter 4714 and <br /> assumes the data on which the design is based are correct. Approval is contingent upon meeting the <br /> requirement(s)listed below. A copy of the�pproved plans and this report must be retained at the project <br /> location. <br /> INSPECTIONS: All plumbing installation�must be tested and inspected in accordance with the requirements of <br /> the Minnesota Plumbing Code. No plumbin�work may be covered prior to inspection. The contractor/installer <br /> must obtain all required inspection permits fi�om the city of Orono Building Official. <br /> REQUIItEMENT(S): <br /> 1. All plumbing shall be installed in accoxdance with the Minnesota Plumbing Code(see Minnesota Rules, <br /> Chapter 4714). <br /> 2. Verify that the existing water supply ar�d waste systems are sized to accommodate the added fixtures(see <br /> Minnesota Rules, Chapter 4714, Sectidns 610.7 through 610.12 and 703.0). <br /> 3. The plans incorrectly show sink S1 serived by a 1'/z-inch vent with a developed length longer than 20 feet. <br /> Unless vent pipes are increased one pipe size for their entire length,horizontal vent pipe length may not <br /> exceed the following(see Minnesota R�ules, Chapter 4714,Table 703.2): <br /> Vent size,in. 1'/a 1'� 2 2'/z 3 4 <br /> M�.length,ft. 15 2 40 60 70 100 <br /> Verify the vent piping is rerouted to co I ply with code or the diameter of the vent piping is increased. <br /> 4. All sanitary drainage pipe within the b ilding must be pitched at'/4-inch per foot minimum(see Minnesota <br /> Rules, Chapter 4714, Section 708.1). here site conditions preclude this slope,pipes 4-inch and larger may <br /> be sloped at'/8-inch per foot where ap oved by the administrative authority. <br /> 5. Water heaters must be accessible with ufficient clearance for maintenance and repair. Unlisted water <br /> heaters must have 12 inches minimum learance on all sides(see Minnesota Rules, Chapter 4714, Sections <br /> 507.26 and 504.3.2). <br /> 6. It is recommended that a cleanout be p�ovided where new waste and vent piping connects with existing <br /> plumbing to facilitate required testing pf the new installation. <br /> 7. Pipe hangers and supports shall compl with Minnesota Rules, Chapter 4714, Section 313.0,Table 313.1, <br /> and the applicable installation standar . <br /> This information can be provid d to you in alternative formats(Braille, large print or audio). <br /> A Equal Opportunity Employer <br />