Laserfiche WebLink
I . <br /> O IT SE�ONLY�, � � � <br /> � Cl�Of OCOriO �l.,.+/����/�� Date Recerve�������Permit#d�����'' ��� <br /> � P.O.Box 66 1�.v v ! = � <br /> 2750 Kelley Parkway �?ount �'�,$��������� <br /> cryst�Bay,Mrr ss323 S�P�2 9 2016 �Appro�edsy:, ��?�t� ' <br /> y.� �� (952)249-4600 � '� :�� ` <br /> L Recommends:' A roval . Denial � <br /> lAKES1-IOR� CIT�(OF ORONO <br /> ��h.�c1� � �s�� <br /> CITY OF ORONO—AUTOM�TIC FIRE SPRINKLER/GENERAL PERMIT Llt� <br /> (All permits must be approved by the Firc M1l�rshatl and/or Building Official) �Q�l�✓` <br /> 1. Permits are required for all fire sprinklier installation and repair. All work shall be done by a licensed <br /> fire sprinkler contractor. Two sets of�blans, specification data sheets, fire flow tests and hydraulic <br /> calculation sheets shall be submitted to the Orono Fire Marshal a minimum of 7 davs before start of <br /> work. <br /> 2. Permits can be applied for by mail at P0 box 66, Orono,MN, 55323 or in person at, <br /> 2750 Kelly Parkway;Phone: (952)2#9-4600. Permits are also available online at: <br /> www.ci.orono.mn.us <br /> 3. All systems shall be designed, instal�ed and maintained to N.F.P.A.-13,N.F.P.A.-25, Minnesota State <br /> Building Code, Minnesota State Fire Code and Standards. All attic systems are to be spaced at <br /> maximum 130 square foot coverage. Plastic pipe will not be allowed at any time in attic spaces. <br /> ' 4. A�li e�quiprnent installed shuil be U.L. or F.M. approved for fire protectior�service. Wa�er fle��es��all � ��• - <br /> be completed on all new systems. �'Vater flow test reports shall be submitted to the Orono Fire Marshal <br /> along with plan submittal. <br /> 5. Yard or wall post indicator valves;are required. All indical.ing and control values installed shall be <br /> provided with tamper protection. �n dry systems,the control valve to service the pressure switch(air) <br /> shall be supervised. <br /> 6. Inspectors test valve shall be inst�lled on each floor level or zone of system. All systems shall have <br /> main drain and inspectors test va ves piped to the outside. <br /> 7. No water is to be introduced intq the sprinkler system until main has been thoroughly flushed. 200#air <br /> test and flushing shall be witnes�ed by the City of Orono Water Department. <br /> 8. An approved audible/visual devlice wired to main flow switch shall be installed above F.D. connection <br /> and in areas normally occupied�by tenants. <br /> i <br /> 9. EXISTING SYSTEMS: If anyj changes in the hydraulically most demanding area,change in <br /> occupancy classification or an�ddition of 20 or more heads,hydraulic calculations and flow test will <br /> be required. I <br /> i <br /> 10. The Orono Fire Marshal shalllwitness all final flow or trip tests. Appointments can be made by calling <br /> the Fire Marshall at(952) 47�-9701, 8:00-4:00 p.m. Monday-Friday. 24-hours notice is requested. <br /> 11. When required, (30 foot building height)stairwell standpipe's shall have 2 'h gate valves installed with <br /> 2 '/z x 1 'h caps. <br /> I <br /> t . .....�.. � _ <br />