My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
fire/safety inspections
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Rd
>
2500 Shadywood Rd - 20-117-23-11-0034
>
Misc
>
fire/safety inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:48:06 PM
Creation date
9/25/2018 10:56:32 AM
Metadata
Fields
Template:
Address
House Number
2500
Street Name
Shadywood
Street Type
Road
Address
2500 Shadywood Road
Document Type
Misc
PIN
2011723110034
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' tl�CO Fire & Simp/exG/'%/�/�e// <br /> Security INSPECTION CONTRACT <br /> SPECTION REPORT NO. .-.___ '__ :� , _ <br /> No. REPORT OF INSPECTION BUREAU FILE _ __ _ ; <br /> CONFERRED WITH NO. <br /> per NFPA 13 & 25 <br /> SET 1 OF 2 ,: <br /> � REPORT TO BUILDING OR LOCATION INSPECTED <br /> ' STREET INSPECTOR <br /> CITY&STATE ZIP SG OFFICE PHONE NO. <br /> ATT. DATE ' <br /> 1.GENERAL Yes N.A.$ No" <br /> A. (To be answered by the Owner or Owner's representative) <br /> a. Have there been any changes in the occupancy classification,machinery or operations since the last inspection? <br /> b. Have there been any changes or repairs to the fire protection systems since the last inspection? ''j <br /> c. If a fire has occurred since the last inspection,have all damaged sprirrkler sqstem components been replaced? <br /> d. Has the piping in all dry systems been checked for proper pitch within the past five years? �'` <br /> Date last checked (checking is recommended at least every 5 years) <br /> e. Has th'e piping in all systems been checked for obstructive materials? -�'�� <br /> Date last checked (checking is recommended at least every 5 years) <br /> f. Have ali fire pumps been tested to their full capacity through the use of hose streams or flow meters within the past 12 months? —�' <br /> s <br /> g. Are gravity,surface or pressure tanks protected from freezing? <br /> h. Are any of the sprinklers 50 years old or older? (testing and/or replacement is recommended for such sprinklers) <br /> i <br /> i. Are anq extra hi5ti temperature solder sprinklers regularly exposed to temperatures near 300°F? <br /> B. (To be answered by the inspector) <br /> a. Have the sprinkler systems been extended to all visible areas of the building? <br /> ; b. Does there appear to be proper dearance between the top of all storage and the sprinkler deflector? !^ <br /> c. Are the building areas protected by a wet system,heated,including its blind attics and perimeter areas,where accessible? ' <br /> d. Are all visible exterior o enin s rotected a ainst the entrance of cold air? <br /> 2.CONTROL VALVES <br /> a. Are all sprinkler system main control valves and all other valves in the appropriate open or closed position? <br /> b. Are all control valves sealed or supervised in the open position? <br /> No. Easily Valve Secured? Supervision <br /> Control Sealed? <br /> Valves of Type Accessible Signs Open If yes, how? (Locked?) Operational <br /> Valves Yes No Yes No Yes No Yes No (Supvd.?) Yes No <br /> CITY CONNECTION q + �( j" � ' <br /> TANK <br /> PUMP <br /> SECTIONAL <br /> SYSTEM � �� / �� ,.0 -,: ; <br /> ALARM LWE � <br /> 3.WATER SUPPLIES Pressure Fire Pump&Tank <br /> a. Water supply source? Ciry Gravity Tank Pressure Fire Pump&City <br /> Waterflow Test Results Made During This Inspection Pressure Fire Pump&Pond <br /> Test Size Static Static Test Size Static Static <br /> Pipe Test Pressure Flow Pressure Pipe Test Pressure Flow Pressure <br /> Located Pipe Before Pressure After Location Pipe Before Pressure After <br /> �.. , .-., <br /> 4.TANKS,PUMPS,FIRE DEPT.CONNECTIONS Yes N.A.$ No` <br /> a. Do fire pumps,gravity,surface or pressure tanks appear to be in good external condition? <br /> b. Are gravity,surface and pressure tanks at the proper pressure and/or water levels? <br /> c. Are fire dept.connections in satisfactory condition,couplings free,caps or plugs in place and check valves tight? <br /> d. Are fire dept.connections visible and accessible? <br /> 5.WET SYSTEMS � 1 <br /> f , � -) <br /> a. No.of systems Make&Model <br /> b. Are cold weather valves in the appropriate open or closed posifion? <br /> if closed,has piping been drained? <br />= c. Has the owner or owner's representative been advised that cold weather valves are not recommended by NFPA? <br /> d. Have all the antifreeze systems been tested? <br /> e. Date antifreeze systems were tested <br /> f. The antifreeze tests indicate protection to: <br /> system 1 2 3 4 5 temperature <br /> .�, � , <br />� g. Did alarm vhbes,wa;�rflow alarm indicators and retards test satisfactorily? " <br /> #Nbt Applicable� <br /> � SG4550-R1-1 �z�os> INSURANCE BUREAU COPY "Explain(No)Answers on eaok ot sheet z `� <br />
The URL can be used to link to this page
Your browser does not support the video tag.