Laserfiche WebLink
� ' . <br /> ' ��������'�� �'�� �ii��`-a: �:������.�e���� <br /> PLAN CHECKED BY � DATE l,�l <br /> � 2118 SHADYWOOD RD <br /> SCOPE OF WORK FaR REPLACEMENTT OF STAIRS ON THE SHOREUNE TQ THE <br /> DOCK. <br /> 1. REMOVE THE EXISTING TOP LANDING, RAlLINGS, AND STAIRS GOING DOWN TO THE <br /> DOCK. <br /> 2. REAAOVE�'HE EXISTING POSTS. <br /> 3. INSTALL NEW 4X4 GREEN TREATED WOOD POSTS. <br /> 4. INSTALL NEW GREEN TREATED WOOD SKIRT BOARDS AND STRINGERS BOLTED TO <br /> THE POSTS. <br /> 5. INSTALL NEW GREEN TREA7ED WOOD STAIR TREADS. <br /> 6. INSTAI.L A NONSLIP SURFACE ON THE STAIR TREADS. <br /> 7. �NSTALL NEW GREEN TREATED WOOD RAfLINGS ON BOTH SIDES. <br /> 8. INSTALL A NEW 4'X6' GREEN TREATED WOOD LANDING AT THE TOP OF THE STAIRS. <br /> 9. INSTALL A CONTINUOS GRASPABLE HANDRAIL. <br /> 10. DiSPOSE OF ALL DEBRIS OFF SfTE. <br /> ������ <br /> ��� <br />