Laserfiche WebLink
t � s <br /> .;,, ,. , .�- . .. <br /> � " � �� � �DETERMINII�G��'�ERMIT��FEES �. � <br /> ❑ SAC Charge(2009 Rate=$2,000.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permif will not be issued) <br /> f <br /> Sewer Connect'on/Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size�inches;material��Schd 40 air tested; cast iron <br /> ❑ Water Connection/Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> ❑ Water Availability For Future Hook-Up to Water($50.00) $ <br /> Water Availabilitv Exnlanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Depamnent. <br /> Required Before Water Connection Permit is Issued: <br /> 1. Issue Water Meter&Horn Permit <br /> 2. Any Additional Connecrion Fees Paid(If Applicable) <br /> Issue Water Connection Pernut: <br /> L Collect Permit Fee&Issue Water Connection Permit <br /> 1. SUBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ .50 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ <br /> ADDITIONAL INFORMATION—WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a se arate permit. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter instaltation. <br /> The undersigned hereby applies to the City of Orono far issuance of a Utility Permit, agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are, true and corre t. <br /> "^ �,i <br /> A licant:� � <br /> PP Date: � G <br />