Laserfiche WebLink
4. Submit a$2,500 escrow and an escrow agreement signed by the property owner(copy attached). <br /> 5. Keep all structure(s)enclosed and/or secured until such time as demolition is camplete. <br /> 6. Keep all demoi'�ion debris off adjoining property and/or the public rights-of way unless specific prior <br /> approval is obtained in writing for temporary use thereof. <br /> 7. Completely remove foundation(s)from the ground. <br /> 8. Completely dispose af all demolition debrls off site in accordance with all applicable PCA requirements. <br /> 9. Abandon water wells in a«:ordance with State Heafth Departmerrt regulations. <br /> 10. Catl for an inspection when all debris has been removed, before badcfilling. <br /> 11. 1Nthin 5 working days of superstructure removal, a flnal inspection shall be requested. The site shall be <br /> !eft clean and clear of all debris, with any excavation fitled with earth level with the adjacent ground <br /> elevation (except when such excavation is to be used as part of a new building and such new building is <br /> actually under construction). <br /> 12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, crushed <br /> and fiiled with native soils. An inspection is�equired after the tanks are pumped and before the tanks are <br /> crushed and fllled. <br /> 13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, <br /> employees and assigns from and against atl claims, damages, losses or expenses, including attomey <br /> fees, against the City, its agents, employees and assigns arising out of or resulting from the demolition <br /> described herein as pe►formed by the property owner, his employees,agents,subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> � $75.00—Principal Structure $ ��� (�O <br /> � $50.00—Accessory Structure x_]_(how many) �o . �b <br /> 1. Subtotal of above permit requested $ � 2.�, v� <br /> 2. State Surcharge 1.00 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ �2�O, GO <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do <br /> all the work in a strict accordance wfth the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are complete,true and correct. <br /> Applicar�t's Signature: Date: (� I l <br /> �w�ro���w� <br /> ���.4a. <br /> Owner's Signature: �:�°'�';".��'��,�°"`�15 Date: 11l23/2015 <br /> Approved By: �� Date: G �� <br /> Building O�cial) <br /> *Zoning Disclosure Required? ❑ YES ��NO IVVW � �mb� ���,� ¢' <br /> "This must be filled out by Zoning Department—For e' r a swer, a 2oning ' 1 ust sign all applica�ions��� <br /> *Approved By: Date: Z � lU� <br /> (Zoning Official) <br /> Form 18st Updated: Juty 2015 <br /> t50784 <br />