Laserfiche WebLink
Erosion Control Suuulemental Information <br /> Final Stabilization will be provided with(seed, sod, etc): <br /> and 6 inches of topsoil will be added/replaced prior to final stabilization. <br /> Concrete Washout: Location of concrete washout <br /> ❑ Not Applicable ❑Off site ❑ Indicated on site plans ❑Other(description): <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is greater,of all vegetation to be retained. <br /> �Yes �Not Applicable � Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects disturbing'/4 acre or <br /> geater. The inspection reyuirements are as follows: <br /> 1) The individual identified as being responsible for implementing the erosion control <br /> plan must routinely inspect the construction site once every seven days during active <br /> construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 <br /> hours. <br /> 2) All inspections and maintenance conducted during construction must be recorded in <br /> writing and these records must be retained with the erosion control plan and made <br /> available at the District's request within 24 hours. Records of each inspection and <br /> maintenance activity shall include: <br /> i. Date and time of inspections; <br /> ii. Name of person conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Corrective actions taken(including dates, times and party completing <br /> maintenance activities);and <br /> v. Date and amount of all rainfall events greater than 0.S inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name <br /> Organization <br /> Phone Alternate Phone <br /> Email <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> Signature of Applicant or Authorized Agent Date <br /> Project Address <br />