Laserfiche WebLink
. . PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> rr� �/ <br /> Address: � �v t� (� , Permit No.:_C,�� �- �l�l� <br /> _ J /., <br /> Description of work: I Q� i�1 �/ T(�d' `�Z GV� Date Rec'd: <br /> Septic review by: Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: Date Approved: � � <br /> Grading review by: Date Approved: <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot Cov ge: SF % <br /> Survey Submitted: � Yes �`No Date of Survey: Revised date ? : <br /> \ <br /> � <br /> Landscape plan submitted? � Yes `� 0 No Landscaper: <br /> ... <br /> Proposed Setbacks: �� <br /> � <br /> Front (Lake) Rear(Street) ( N S E W ) ( S E W ) Other Buildings Wetland <br /> Si Side <br /> Defined Height: Peak Height: F E: FFE minus 6 feet= (Existing Contour) <br /> Perimeter(linear feet) = 50% = L.F. below grade <br /> Basement? 0 Yes 0 No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between th lowest propos d Slab at or above grade— <br /> floor(of the basement crawl space)an measure from hiqhest existing <br /> START WITH the highest point of th roof. rq ade to the highest point of the <br /> START WITH roof even if fill was brought in to <br /> elevate home. <br /> If you have a... <br /> SUBTRACTION • GABLE O IPPED ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtract half the distance from highest existing grade to the <br /> ROOF TYPE) between e highest point of the roof hi hest oint of the roof. <br /> to the lo point of the corresponding If you have a... <br /> gable hipped roof SUBTRACTION ' GABLE OR HIPPED ROOF <br /> GAB OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> • win ws): Subtract half the distance ROOF TYPE) the distance between the <br /> bet een the top of the highest highest point of the roof to <br /> wi dow and the highest point of the the low point of the <br /> r f corresponding gable or <br /> hipped roof <br /> • LL OTHER ROOF TYPES(flat, • GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Su ract the distance between the half the distance between <br /> (BASED ON ba emenUcrawl space floor and the the top of the highest <br /> EXISTING hi hest existing grade adjacent to the window and the highest <br /> GRADES) f undation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: October 2015 � <br /> z:\forms\plan review checklist 10-2015.docx <br />