Laserfiche WebLink
� o� <br /> 0 0 <br /> �� C ITY of ORONO <br /> g . <br /> � � <br /> � <br /> �',� G'�' RESOLUTION OF THE CITY COUNCIL <br /> �`�kESII�4� NO. �A� <br /> 6. Wetland. The area delineated as wetland as shown on the preliminary plat <br /> drawing shall be subject to the standard Flowage and Conservation Easement. <br /> This wetland is classified as a Manage 1 requiring implementation of a 35' <br /> wetland buffer and a 20' structure setback from that buffer for a total of 55' of <br /> setback. The developer shall execute a buffer maintenance covena.nt to be filed in <br /> the chain of title. <br /> 7. Grading and Drainaae Requirements. General site grading and individual <br /> house site grading shall adhere to the approved plans, so as to direct as much <br /> stormwater and snowmelt runoff from the development as is feasible to the <br /> raingardens proposed in the approved Storm water Pollution Prevention Plan. <br /> Applicant shall provide an engineered design for all retainina walls exceeding 4' <br /> in height,prior to final plat approval. <br /> 8. Trail Easement. An easement for public trail purposes shall be granted by the <br /> Developer over the easterly and northerly 10 feet of the plat. However, this <br /> requirement will be eliminated if prior to final plat approval the Council <br /> determines that no such easement is necessary. <br /> 9. City Engineer Approval. Approval is subject to recomrnendations of City <br /> En�ineer Thomas Kellogg in his letters dated November 9, 2005, January 6, 2006 <br /> and February 16, 2006. <br /> 10. Minnehaha Creek Watershed District Approval. Approval is subject to <br /> MCWD approval and permits as required. Final plat approval shall not be �ranted <br /> until the Developer has provided evidence that all required MCWD pennits have <br /> been obtained. <br /> 11. Plans and Specifications. The following plans and specifications shall be <br /> submitted for review and approval by the City and other appropriate jurisdictions, <br /> to ensure that the proposed plat will accomplish the intended purposes: <br /> a) Final plans and specifications for all proposed utility lines and services. <br /> b) Final grading, drainaae and erosion control plan and SWPP, showing <br /> existinQ and proposed contours, buildinQ locations, elevations, stormwater <br /> facilities and calculations, utilities and erosion control measures to be used <br /> durinQ construction. Final Plat Approval v�rill not be granted until the <br /> Paae � of 9 <br />