Laserfiche WebLink
LEGAL DESCRIPTION: <br />Lots 61, except the southwesterly 15 feet thereof, and Lot 62, ORONO OCHARDS, Hennepin County, Minnesota. <br />SCOPE OF WORK & LIMITATIONS: <br />1. Showing the length and direction of boundary lines of the legal description listed above. The scope of our services does not include determining what <br />you own, which is a legal matter. Please check the legal description with your records or consult with competent legal counsel, if necessary, to make sure <br />that it is correct and that any matters of record, such as easements, that you wish to be included on the survey have been shown. <br />2. Showing the location of observed existing improvements we deem necessary for the survey. <br />3. Setting survey markers or verifying existing survey markers to establish the corners of the property. <br />4. Showing elevations on the site at selected locations to give some indication of the topography of the site. We have also provided a benchmark for your <br />use in determining elevations for construction on this site. The elevations shown relate only to the benchmark provided on this survey. Use that <br />benchmark and check at least one other feature shown on the survey when determining other elevations for use on this site or before beginning <br />construction. <br />5. It should be noted that this survey was done under snow and ice conditions and that all improvements may or may not have been shown correctly. While <br />we did our best to locate all improvements under the snow and ice, we can't be sure that all improvements were shown. Please look over the survey to be <br />sure everything you need shown is shown correctly. <br />6. This survey has been completed without the benefit of a current title commitment. There may be existing easements or other encumbrances that would be <br />revealed by a current title commitment. Therefore, this survey does not purport to show any easements or encumbrances other than the ones shown <br />hereon. <br />7. Note that all building dimensions and building tie dimensions to the property lines, are taken from the siding and or stucco of the building. <br />8. While we show a proposed location for this home or addition, we are not as familiar with your proposed plans as you, your architect, or the builder are. <br />Review our proposed location of the improvements and proposed yard grades carefully to verify that they match your plans before construction begins. <br />Also, we are not as familiar with local codes and minimum requirements as the local building and zoning officials in this community are. Be sure to show <br />this survey to said officials, or any other officials that may have jurisdiction over the proposed improvements and obtain their approvals before beginning <br />construction or planning improvements to the property. <br />9. While we show the building setback lines per the City of Orono web site, we suggest you show this survey to the appropriate city officials to be sure that <br />the setback lines are shown correctly. Do this BEFORE you use this survey to design anything for this site. <br />STANDARD SYMBOLS & CONVENTIONS: <br />"0" Denotes iron survey marker, set, unless otherwise noted. <br />GRADING & EROSION CONTROL NOTES: <br />BEFORE DEMOLITION AND GRADING BEGIN <br />• Install silt fence/bio roll around the perimeter of the construction area. <br />• Sediment control measures must remain in place until final stabilization has been <br />established and then shall be removed. Sediment controls may be removed to <br />accommodate short term construction activity but must be replaced before the next <br />rain. <br />• A temporary rock construction entrance shall be established at each access point to <br />the site and a 6 inch layer of 1 to 2 inch rock extending at least 50 feet from the <br />street into the site and shall be underlain with permeable geotextile fabric. The <br />entrance shall be maintained during construction by top dressing or washing to <br />prevent tracking or flow of sediments onto public streets, walks or alleys. Potential <br />entrances that are not so protected shall be closed by fencing to prevent unprotected <br />exit from the site. <br />• Contractor shall install inlet protection on all existing storm sewer inlets in <br />accordance with the city standard details. Inlet protection shall also be provided on <br />all proposed storm sewer inlets immediately following construction of the inlet. <br />Inlet protection must be installed in a manner that will not impound water for <br />extended periods of time or in a manner that presents a hazard to vehicular or <br />pedestrian traffic. <br />DURING CONSTRUCTION: <br />• When dirt stockpiles have been created, a double row of silt fence shall be placed to <br />prevent escape of sediment laden runoff and if the piles or other disturbed areas are <br />to remain in place for more than 14 days, they shall be seeded with Minnesota <br />Department of Transportation Seed Mixture 22-111 at 100 lb/acre followed by <br />covering with spray mulch. <br />• A dumpster shall be placed on the site for prompt disposal of construction debris. <br />These dumpsters shall be serviced regularly to prevent overflowing and blowing <br />onto adjacent properties. Disposal of solid wastes from the site shall in accordance <br />with Minnesota Pollution Control Agency requirements. <br />• A separate container shall be placed for disposal of hazardous waste. Hazardous <br />wastes shall be disposed of in accordance with MPCA requirements. <br />• Concrete truck washout shall be in the plastic lined ditch and dispose of washings as <br />solid waste. <br />• Sediment control devices shall be regularly inspected and after major rainfall events <br />and shall be cleaned and repaired as necessary to provide downstream protection. <br />• Streets and other public ways shall be inspected daily and if litter or soils has been <br />deposited it shall promptly be removed. <br />• If necessary, vehicles, that have mud on their wheels, shall be cleaned before exiting <br />the site in the rock entrance areas. <br />• Moisture shall be applied to disturbed areas to control dust as needed. <br />• Portable toilet facilities shall be placed on site for use by workers and shall be <br />properly maintained. <br />• If it becomes necessary to pump the excavation during construction, pump discharge <br />shall be into the stockpile areas so that the double silt fence around these areas can <br />filter the water before it leaves the site. <br />• Temporary erosion control shall be installed no later than 14 days after the site is <br />first disturbed and shall consist of broadcast seeding with Minnesota Department of <br />Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray <br />mulch. <br />• Erosion control measures shown on the erosion control plan are the absolute <br />minimum. The contractor shall install temporary earth dikes, sediment traps or <br />basins and additional silt fencing as deemed necessary to control erosion. <br />SITE WORK COMPLETION: <br />• When final grading has been completed but before placement of seed or sod an as <br />built" survey shall be done per City of Orono requirements to insure that grading <br />was properly done. <br />• When any remedial grading has been completed, sod or seeding shall be completed <br />including any erosion control blankets for steep areas. <br />• When turf is established, silt fence and inlet protection and other erosion control <br />devices shall be disposed of and adjacent streets, alleys and walks shall be cleaned <br />as needed to deliver a site that is erosion resistant and clean. <br />• Contractor shall maintain positive drainage of a minimum 2% slope away from <br />proposed building. <br />X 990•? X 9896 <br />x,990------ 990.0 -__ '\\� <br />\ PROPOSED ELEVA TIONS <br />X g89 9 I FIRST FLOOR (SUB -FLOOR) = 991.40 <br />1 <br />- - -99° - - � TOP OF FOUNDA TION = 989.6 7 <br />X 990.3 I I BASEMENT FLOOR = 981.00 <br />I \ \ <br />I \ - \ � 9890 UPPER GARAGE FLOOR = 989.21 <br />INSTALL SILT LOWER GARAGE FLOOR = 979.54 <br />988.7 \ ; FENCE/B/0 ROLL <br />Fo° 12" » 14" <br />\ \ \ 099016" X 9$\9.4X 987.6 <br />\ I \ \ <br />6- 991.1 0991. \ vlj <br />� 09918 9915X 9 \ � �"�� <br />10" 987.1 1 1 Q1-- INSTALL ROCK CONSTRUCTION <br />\ \ \ 099 .7 \ \ \ X 985.5 , ENTRANCE PER NOTES \ 0991.3 6„ <br />\� 9 , <br />\ \ 6" \ 12" �i' 92.1 \ , \8 88.3 ( X 984.8 ' <br />993.4 , 9 2.1 \ \ � <br />0993.2 �\ QV f^'+� 0991.6 SF S I � / <br />\ 0� .1 \� 995.0 9Qr 2. 8 \ 9g4, ��? <br />i <br />14 , n9 <br />v v \ h, -9v \ 6" 9 ` \ � x 982 �s r-- INSTALL SILT <br />14 \ 129,941 '� 12" \ 0991.5 `< j6 \\` W 983. i 1_ ' FENCE/5/0 ROLL <br />X �5 \ 12" ,' -0990.0 �4" % 91. \ 981.7 ----/ <br />X89 ��,� 6���� CCS „ 10» ( 991.1 \V A \ ,' - ' - - T - THE COMBINA TION OF PROPOSED DRI AEWA YS <br />s \" 979 2 x I IS NOT POSSIBLE DUE TO GRADE CHANGES IN <br />\� o SMITH A VENUE AND PROPOSED HOUSE <br />X30" \ eta 8 09382 �\ , \0990 3 . 8 <br />\ \ \ \ \ 098s.� / \ \ \\ ' ^0988.1 \ 10„ 9B5 \ \ \ \ 9� ��, �� LAYOUT. THE CITY MAXIMUM DRIVEWAY SLOPE <br />\ AND LOT DEPTH/SETBACK DISTANCES <br />,3B" � � 6„ vvv 10"�09894�� � -18.0__ ���\\A i`1+•�` 92�'�^oa� � OF <br />TRIC T DRI M/NAT/N. <br />989.6 LSO ES CSD E COB 0 <br />098 \ 6"\8.1 \ / <br />\ \ \ \\✓ / ^ X 989 6 9B6 \ \ 978 4 \ r <br />\ \ \ \ ` - 979. <br />\ \ 0985.4 \ �� 6 \ \ X( 989• <br />\ \ \ \ \ \ \ \ SETBACK-�____ - X85 �,K r,s 9 .1 <br />\ \ \ \ \ \ \ \ <br />LINE (TYP)� �- - 9 4 10 - ► 6» \\\\\ 9�R `-PROPOSED X 9 978 i \ INSTALL ROCK CONSTRUCTION <br />8 84 7 Bey Op 98% ENTRANCE PER NOTES <br />\ \ \ 367 - -iwf �\/ a b X977 ��� <br />71 <br />\-y82\\� 113 - 98 ^ > �i�' - -�� \ _ �- g0 , 3 3 <br />\ \ \ <br />\\ <br />�&79,1_ `�0 0 <br />\ �� o <br />-,6,37 1� Q\ s 9rn �� 97 A <br />6l 8.8 8"� �6\886'7\,'6„ �/ - - _ ! ��0 \ ti 3.9 �� \ 9 i�, 97:9t�r- - �Qo 76.4 'S'��'7C,h <br />\ \ \ +,.�' \ 9 5 ep 975.2 <br />9'e 8" 9797 �� 982.1 .1 Q \ . 9 0 997: �brr X76 9�s s <br />\�74 7\ \ \ \ ;� " 98u 9 �� 82 2 �-9,f h0 �' �c 7 7 Sok 97 2 x 975 2 <br />l � <br />96' .7 V 0" \ \ 9781 i 981.3 16, 2. �� , CD 7,� Y % <br />0 " 9 1.9 Q On + �97� Oh�r DR��W A �` s s 97s.4 2 <br />0'' \ 0 cy ORIVEWAY�, <br />�. <br />� <br />6n a �, Q" �� \�Sy4' \9 809 8 ` �QIV <br />8.5 <br />X 9768PROPOSED <br />0 X <br />\ <br />V v V vs� \ E97 �,,' e x 77.4 V <br />01 6 \ \ \� \ \ may\\ \ \ �f,�„�974 � h1y' 9,90 <br />�s� \ \, \ \ � INSTALL SIL T- .i9B9.2t�r <br />\ \ \ \ \ \ FENCE/BIO ROLL9'9 - - - - - _ DWELLING T9.4b�r <br />\ /1 <br />s'c� / �` 9,3.2 x <br />A.984.8t 0 <br />X 979.3 X ` <br />'1'c 0 0 9�9.Ob�r \ x 97- <br />14- 7 \ <br />9�s�8 \ \\ �.0 ,'��` �� i 18" 79.4�fi�� \ <br />\ \ i i� <br />09764 �fi� <br />I\ 12 9 \ \ \ \ y 6'o PROPOSED <br />JV <br />_ _ / \ �\ f' / -INSTALL SILT <br />h `' ' ,� QO / ^� / � / FENCE/B/O ROLL <br />\ X 9794 <br />\ �� V A �.' efly X 9797.9� <br />C)� / ' ywd9 2 ,' �\ , . 978.8 <br />INSTALL SILT- 18' <br />FENCE/B/O ROLL I �?�' ��\ X 979.1 <br />I s� <br />X 979.410 <br />s <br />ao <br />l <br />S� '' 0`i 78.6 <br />10,F` 9 <br />0979, <br />\ /) <--- <br />\ \ X 978.1 17� <br />i <br />\ 9)9 <br />foo \\ <br />EXISTING CONTOUR - - - 9 80 - <br />EXISTING SPOT LLEV,4.rI01V X 980.5 <br />EXISTING HARDCOVER <br />PROPOSED HARDCOVER <br />PROPOSED CONTOUR 960 <br />House <br />2,281 Sq. Ft. <br />House <br />3,536 Sq. Ft. <br />Driveway <br />435 Sq. Ft. <br />Driveways <br />3,367 Sq. Ft. <br />PROPOSLIJ SPOT L7 EV4TIONf <br />980.5 <br />Porch <br />183 Sq. Ft. <br />Front Porch <br />224 Sq. Ft. <br />Concrete Surfaces <br />458 Sq. Ft. <br />Rear Screen Porch <br />224 Sq. Ft. <br />Retaining Walls <br />64 Sq. Ft. <br />Walk <br />111 Sq. Ft. <br />P_RAINAGLI ARR0#r - FLOK <br />Shed <br />85 Sq. Ft. <br />Retaining Walls <br />50 Sq. Ft. <br />SILT FLNCL/BIO ROLL SF <br />TOTAL EXISTING HARDCOVER <br />3,506 Sq. Ft. <br />TOTAL PROPOSED HARDCOVER <br />75512 Sq. Ft. <br />AREA OF LOT <br />30,770 Sq. Ft. <br />AREA OF LOT <br />30,770 Sq. Ft. <br />TRLL' RLr110DAL 0 <br />DATE REVISION DESCRIPTION <br />4/17/18 REMOVED PROP. DECK & ADDED DRIVE DIMENSIONS <br />PERCENTAGE OF HARDCOVER TO LOT 11.40 <br />DRAWING ORIENTATION & SCALE <br />N <br />SCALE - 1" = 20' <br />0 20' 40' <br />PERCENTAGE OF HARDCOVER TO LOT 24.4% <br />CLIENT NAME / JOB ADDRESS <br />ANGIE HOPPING <br />95 SMITH A VENUE <br />ORONO, MN <br />Advance <br />Surveying & Engineering, Co. <br />17917 Highway 7 <br />Minnetonka, Minnesota 55345 <br />Phone (952) 474-7964 <br />Web: www.advsur.com <br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR <br />REPORT WAS PREPARED BY ME OR UNDER MY DIRECT <br />SUPERVISION AND THAT I AM A DULY LICENSED <br />PROFESSION AL_E�GINEER UNDER THE LAWS OF THE STATE <br />OF MINNES2TA. / /1 , <br />L- I.,CIVor- IVl/. <br />APRIL 13, 2018 <br />DATE <br />DATE SURVEYED: JANUARY 29, 2018 I SHEET TITLE <br />SURVEYED BY <br />ADVANCED SURVEYING. & ENG., CO. <br />DATE DRAFTED: APRIL 13, 2018 <br />PROPOSED SURVEY <br />DRAWING NUMBER <br />180158 JR <br />SHEET SIZE 22 X 34 <br />CUCCT Kir) <br />S1 <br />SHEET 1 OF 1 <br />