My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#6001-Prelim Plat/vacation /easements-2010
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Circle
>
3201 Shadywood Circle - 20-117-23-11-0042
>
Survey
>
#6001-Prelim Plat/vacation /easements-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:48:45 PM
Creation date
8/22/2018 12:53:30 PM
Metadata
Fields
Template:
x Address Old
House Number
3201
Street Name
Shadywood
Street Type
Circle
Address
3201 Shadywood Circle
Document Type
Survey
PIN
2011723110042
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� .�0,�. <br /> O 0 <br /> CITY of ORONO <br /> � � � <br /> ti <br /> �.�tiL �p~' RESOLUTION OF TH�COITY ;OUNCIL <br /> �k'ESI��� NO. � <br /> 5) City Engineer Approval. Approval is subject to the existing and ongoing recommendations of <br /> the City Engineer. <br /> 6) Plans and Specifications. The following plans and specifications shall be submitted for <br /> review and approval by the City and other appropriate jurisdictions prior to final plat <br /> approval, to ensure that the proposed plat will accomplish the intended purposes: <br /> a) Final grading, drainage and erosion control ptan showing existing and proposed <br /> contours, anticipated building locations, elevations, stormwater facilities and <br /> calculations, utilities and erosion controi measures to be used during construction. <br /> Final Plat Approval will not be granted until the Minnehaha Creek Watershed District <br /> has approved the stormwater management plans. <br /> b) Wetland delineation report and Functional Assessment of Wetlands report approved <br /> by the MCWD. <br /> c) Sufficient detail to meet the recommendations of the City Engineer. <br /> 7) Other Easements. <br /> a) Drainage and Utility Easements shall be dedicated to the public on the final p{at 10' <br /> along all exterior property lines except such easements shall be increased to <br /> accommodate drainage or where existing utility lines where required, subject to City <br /> staff approval. <br /> b) A 10' wide trail easement in the same location as the 10' wide exterior property <br /> boundary drainage and utility easement along Shadywood Road shall be granted to <br /> the City of Orono. <br /> c) A Wetland Buffer, Conservation and Flowage Easement shall be granted to the City <br /> of Orono over all defineated wetlands on the property. Wettand buffer maintenance <br /> agreements shall similarly be established. <br /> 8) Development Agreement. A Development Agreement shall be required to include <br /> appropriate conditions and financial guarantees for improvements to the property. " <br /> FINAL SUBM(TTALS <br /> The following (ist of final submittals must be submitted to the Planning & Zoning Coordinator at <br /> least four (4) weeks prior to the regularly scheduled Council meeting on the second and fourth <br /> Mondays of the month. These submittals are as follows: <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.