Laserfiche WebLink
���, <br /> , . )�� <br /> CITY OF ORONO SEPTIC SYSTEM PERMTr APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, N1N 55323 <br /> JOB s� ���s: � ��c� �1� �.�������� _ <br /> Occupancy Type: Residential �_ Commercial 4ther <br /> Permit Type: New or Replacement System, $100.00 �-- <br /> Repair Existing System, $ 50.00 <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: PhoneNumber: <br /> Mailing Address: City: tiP� <br /> Contractor's Name: ; � . '�r �_ c. � z :— Phone Nymber: `�S ; -(, �-�(,�.� <br /> Mailin Address: % �� � ��i�s -f l/._v i T� City: / t, � �ip: � �G .� <br /> g �_ <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> O�ces; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the pernut card is on the jc�b <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Desa,�n <br /> reports are not considered approved unless accompanied by the "Ciry of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor� <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is requue� <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content)y <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Cert�cate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. � <br />